Similar Projects
Delaware Water Quality Project - 36107019 - El Dorado County
Infrastructure
Conception
$400,000 est. value
Pollock Pines, CA 95726

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

Oak Hill Road at Squaw Hollow Creek Bridge Replacement
New Construction, Infrastructure
Bidding
$4,500,000 CJ est. value
Placerville, CA 95667

Guardrail Upgrades Multiple Locations - West Slope - 36105075 - El Dorado County
Infrastructure
Bidding
$573,000 CJ est. value
Placerville, CA 95667

Motherlode Force Main Replacement Phase 3A
Infrastructure
Post-Bid
$3,900,000 est. value
CA

Flume 45 Section 3 Replacement - El Dorado Irrigation District
Infrastructure
Post-Bid
$11,000,000 CJ est. value
Placerville, CA 95667

2022 Bijou 2/3 Waterline Replacement Project
Infrastructure
Results
$2,165,707 est. value
South Lake Tahoe, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Design
$15,000,000 CJ est. value
Cameron Park, CA 95682

Missouri Flat Road and Crossings Road Improvement
Infrastructure
Bidding
$2,750,000 CJ est. value
Placerville, CA 95667

Last Updated 06/29/2023 04:37 PM
Project Title

Motherlode Forcemain Replacement Program - El Dorado Irrigation District

Physical Address View project details and contacts
City, State (County) Placerville, CA 95667   (El Dorado County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Motherlode force main (MLFM) was originally constructed in 1977 and conveys wastewater from the El Dorado lift station approximately nine miles west to the Deer Creek Wastewater Treatment Plant. Six additional lift stations pump directly into the force main as well as several private lift stations. The MLFM was originally constructed with 12-inch asbestos cement pipe and has several peaks and valleys as it progresses through the terrain. As wastewater is pumped over the peaks in the force main, the high points regularly become empty and are susceptible to high levels of hydrogen sulfide gas corrosion. The long term impact of hydrogen sulfide gas exposure is varying levels of degradation in the pipe. To date, approximately 50% of the forcemain has been replaced with larger diameter, plastic pipe. This project will replace approximately 3.3 miles of existing 12-inch asbestos cement pipe with 18-20-inch plastic pip As of June 29, 2023, construction commenced on May 30, 2023. All trades have been awarded. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents