Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Ocotillo Road Improvements, Gilbert Road to 148th Street
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Chandler, AZ 85249

Pavement Preservation
Infrastructure
Bidding
$2,943,000 est. value
AZ

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

Intersection Improvement Services Job Order Contract
Post-Bid
$5,000,000 est. value
Phoenix, AZ 85003

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

McKellips Road SR101 to Alma School Road
Infrastructure
Bidding
Phoenix, Scottsdale, AZ 85009

Festival Ranch Parcel Q1 Phase 2 Concrete
Post-Bid
Sun City, AZ

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

North Economy Parking Lot Expansion
Infrastructure
Bidding
Mesa, AZ

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

2020 District-Wide Paving Maintenance
Results
$1,669,834 est. value
Tempe, AZ

Reported 01/12/2022 04:49 PM
Project Title

Jackrabbit Crossing - West Indian School Road Eastbound Half Street Improvements, West Of North Jackrabbit Trail

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85042   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $1,275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

West Indian School Road Eastbound Half Street Improvements west of North Jackrabbit Trail including, but not limited to, site preparation/demolition; rough grading; sanitary sewer; storm drainage; concrete; asphalt paving; signage and striping; street lights; landscape and irrigation; miscellaneous construction; general conditions; and miscellaneous permits and approvals. Note: Public Water Improvements will be bid and contracted for separately by Arizona Water Company.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Planting Accessories, Landscape Surfacing.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents