Similar Projects
Big River Regional Trail Mendota Trailhead
Bidding
$1,400,000 est. value
Mendota Heights, MN 55120

Greenleaf Elementary Galaxie Pedestrian Crossing
Bidding
$406,458 est. value
Apple Valley, MN 55124

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

Steve Michaud and Rolling Oaks Parks Parking Lot and Trail Improvements
Post-Bid
$625,000 est. value
Lakeville, MN 55044

Traffic Control Signal System and ADA Improvements
Results
Eagan, MN 55120

2021 Street Rehabilitation
Results
$6,500,000 est. value
Lakeville, MN

Cliff Road Trail 13 to Eagan
Bidding
$1,000,000 to $1,500,000 est. value
Eagan, MN 55123

2021 Street Improvement
Results
$2,500,000 to $3,500,000 est. value
Burnsville, MN

Downtown M&O and General Sidewalk
Term Contract
Bidding
Saint Paul, MN

Highview Avenue Improvement
Results
$1,500,000 to $1,700,000 est. value
Lakeville, MN 55024

Downtown M&O And General Sidewalk
Renovation
Bidding
Saint Paul, MN

155th Street and Pilot Knob Roadway Improvements and Orchard Place Pilot Knob Turn Lane Improvements
Results
Less than $3,144,211 est. value
Apple Valley, MN 55124

Concord Street Improvements
Bidding
South Saint Paul, MN 55107

2021 Street Improvements
Results
Rosemount, MN

4th Street South Reconstruction
Bidding
South Saint Paul, MN 55075

Last Updated 02/17/2021 05:45 AM
Project Title

2021 Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Inver Grove Heights, MN   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate quantities of major items of work are as follows: Remove Curb and Gutter 880 LF Adjust Frame and Ring Casting 3 EACH Remove Bituminous Pavement 3,600 SY Bituminous Pavement 860 TON Common Excavation 660 CY Concrete Curb and Gutter 880 LF Subgrade Excavation 700 CY Boulevard Topsoil Borrow 70 CY Aggregate Base Class 5 1,600 TON Silt Fence 330 LF Stabilizing Aggregate, 3" Minus 1,000 Ton

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents