Similar Projects
Frames and Grates
Bidding
Leicester, MA

Rehabilitate Existing Sewer Collection System
Bidding
$500,000 est. value
Tyngsborough, MA

Catch Basin Cleaning
Post-Bid
Less than $40,000 est. value
Winchester, MA

On-Call Sewer Services FY20-S1
Term Contract
Post-Bid
Hingham, MA 02043

Sewer System Infiltration Rehabilitation – Year 14
Results
$1,100,000 est. value
Milton, MA 02186

Dorchester Interceptor Sewer
Results
Less than $6,000,000 est. value
Mattapan, MA

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Masonic Street Parking Lot and Amber Lane Sewer and Water Replacement Project
Bidding
$720,000 est. value
Northampton, MA

Removal Transportation and Disposal of Storm Debris
Post-Bid
Less than $50,000 est. value
Yarmouth, MA

Chelsea High School Sewer Service
Results
Chelsea, MA

Mini-P Area Sewer System Rehabilitation
Bidding
Medford, MA

Water Pollution Control Sewer Vacuum System Control Emergency CVS PLC Control Repair
Post-Bid
Less than $40,000 est. value
Hyannis, MA

Sewer Main Replacement at Lancaster Complex
Results
Less than $281,361 est. value
Lancaster, MA

Union Street Phase 2 Sewer Separation
Bidding
Less than $3,600,000 est. value
New Bedford, MA 02740

West Street Force Main Replacement
Post-Bid
Less than $94,000 est. value
Danvers, MA

Reported 03/26/2020 12:00 AM
Project Title

Bluebird Sewer Pipeline Project Contract No. 2

Physical Address View project details and contacts
City, State (County) Chicopee, MA   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $874,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of approximately 3,700 linear feet of new 4-inch sewer force main, and installation of approximately 1,850 linear feet of 8-inch gravity sewer mains. Work also include restoration of paved and vegetated areas. The Work will be substantially completed within 180 days from the date of Notice to Proceed, and completed within 240 days from the date of Notice to Proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents