Similar Projects
Pinkney Fuel Site Replacement Construction Management at Risk Services
Bidding
Sarasota, FL

Building #26 Gas Piping Repair Project
Post-Bid
Sarasota, FL

Fuel Management System Replacement/Upgrade
Post-Bid
Panama City, FL

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Aircraft Self Fueling Facility
Construction
Less than $842,911 est. value
FL

500 Gallon Diesel Tanks
Post-Bid
Port Saint Lucie, FL 34984

Fuel Farm Relocation
Results
Less than $791,000 est. value
Marianna, FL

15400 Gallon Hydroxide Tank Disposal
Post-Bid
Boynton Beach, FL 33425

Hillcrest Well Site - Hydropneumatic Tank Replacement
Results
FL

ATC Campus Thermal Energy Storage Tank and Site Work
Results
Daytona Beach, FL 32100

Fuel Tank Project Brandon Campus
Results
Less than $65,000 est. value
Tampa, FL

Fuel System Inspection and Repair Services
Term Contract
Results
Less than $250,000 est. value
Dania, Fort Lauderdale, Hollywood, Pembroke Pines, Pompano Beach, FL

Replace Double Wall Fuel Line
Results
$100,000 to $250,000 est. value
Panama City, FL 32403

Airport Fuel Farm Replacement
Results
West Palm Beach, FL

Last Updated 03/14/2019 04:34 AM
Project Title

Sodium Hypochlorite Tank Replacement

Physical Address View project details and contacts
City, State (County) Boynton Beach, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Removal and Disposal of existing Sodium Hypochlorite Tank 1. Sodium Hypochlorite Tank 21,846 gallons capacity. Installation of new Sodium Hypochlorite Tank. This includes all equipment, labor, materials, and all other appurtenances for the installation and operation of the tank. Replace an existing Sodium Hypochlorite Tank with an in-kind replacement tank at the East Water Treatment Plant. The existing tank has a capacity of 21,846 gallons and was supplied by PlasTanks Industries, Inc. in accordance with the attached manufacturer's cut sheet. The new tank shall meet a wind load of at 140 mph. The work includes the hauling and disposal of the existing tank; furnishing and installation of the new tank, hardware, and appurtenances; reconnection of all piping according to the existing installation and manufacturer's cut sheet; and all other work and appurtenances for a complete installation.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents