Similar Projects
Alligerville Fire House
Addition
Design
High Falls, NY 12440

Z1DA--528A5-17-526 Fire Department Upgrades
Renovation
Design
$1,000,000 to $5,000,000 est. value
Canandaigua, NY 14424

Construction of a Steel Building - New Slate Hill Fire House
New Construction - 12,800 SF
Post-Bid
Less than $2,500,000 est. value
Slate Hill, NY 10973

Improvements to Fire Stations 1, 2 and 4
Post-Bid
Schenectady, NY

Additions and Alterations at Green Street Fire Station
Addition
Results
$4,000,000 to $4,500,000 est. value
Mount Kisco, NY 10549

Town of Cairo Ambulance Project
Results
Cairo, NY 12413

Cambridge Volunteer Firehouse
New Construction - 10,000 SF
Construction
$2,500,000 est. value
Cambridge, NY 12816

Weaver Street Fire Station
Construction
Less than $1,300,000 est. value
Larchmont, NY 11791.

Rotterdam Fire District 2 Site Renovations
New Construction, Renovation
Design
Rotterdam, NY 12306

Firematic Training Site - Fire Safety Building Improvements
Renovation
Post-Bid
Pomona, NY 10970

Construction of a New Firehouse Facility
New Construction, Demolition - 23,934 SF
Results
$14,000,000 est. value
Valley Cottage, NY 10989

Nichols Fire Station Addition and Renovations
Renovation, Addition, Term Contract
Construction
$3,000,000 to $4,000,000 est. value
Nichols, NY 13812

New Fire Station
New Construction
Post-Bid
Less than $3,700,000 est. value
Warwick, NY 10990

Firehouse Addition
Addition
Results
Less than $450,000 est. value
Johnsonville, NY 12094

Waterford Fire Station at 8th Street
Construction
Waterford, NY 12188

Reported 12/18/2021 12:00 AM
Project Title

Fire Station 10 and Fire Station 4 Structural Rehabilitations

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10705   (Westchester County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, materials and equipment to complete the structural rehabilitation of Fire Stations 4 & 10, as indicated on the contract documents. This project generally consists of the following work components: A. Filing of all permits required for the work; B. Installation, maintenance and removal of scaffolding, pedestrian protection structures and worker safety measures; C. Installation, maintenance and removal of temporary shoring and other structural supports; D. Professional Engineering Services to support the work of the Contractor; E. Repair existing structural elements at Fire Stations 4 & 10 as indicated on the plans; F. Install HVAC improvements at Fire Station 4 as indicated on the plans; G. Miscellaneous additional work as may be required.

Details

Fire/Police Station, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents