Similar Projects
The Fieldhouse
New Construction
Conception
Tallahassee, FL 32304

Saint Augustine Student Housing
New Construction
Conception
Tallahassee, FL

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

Lynn University Student Housing
New Construction - 126,369 SF
Design
$10,000,000 CJ est. value
Boca Raton, FL 33427

FAMU Student Housing Phase 1A - FINROCK Construction
New Construction - 91,000 SF
Post-Bid
Tallahassee, FL

Programming, Financial Analysis, Design, Construction and Possible Management of Student Housing
Post-Bid
Sanford, FL 32771

Z--Preservation and Stabilization of Engineering Officers` Quarters & Front 4 Curt
Results
Key West, FL

The Seed School Of Miami - Dormitory
New Construction - 22,034 SF
Construction
$20,000,000 est. value
Miami, FL 33010

Tiger Landing Student Housing
Renovation - 27,868 SF
Construction
$3,455,000 est. value
Jacksonville, FL 32209

Legacy at The Standard
New Construction
Conception
Gainesville, FL

Collegiate Village Student Housing - West Parcel
New Construction
Design
Orlando, FL 32826

Marshall House Project
Renovation - 1,914 SF
Post-Bid
$400,000 est. value
Clearwater, FL 33755

The Nine at Tallahassee - Phase II
New Construction, Demolition - 63,238 SF
Construction
$16,000,000 est. value
Tallahassee, FL 32304

Collegiate Village Student Housing - East Parcel
New Construction
Design
Orlando, FL 32817

Palm Meadows Dorms
New Construction - 26,000 SF
Post-Bid
$4,700,000 est. value
Boynton Beach, FL 33472

Reported 12/13/2019 12:00 AM
Project Title

FAMU Gibbs Hall Dormitory Third Floor Buildout

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32307   (Leon County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the replacement of the lower level floor slab in the north wing of Gibbs Hall. The slab is approximately 4,100 sf and is elevated over an unfinished crawl space. This will involve rerouting of the building’s utilities so the remaining floors can remain occupied and the complete demolition and reconstruction of all resident rooms sitting on the slab being replaced. The project scope of work involves installing a new cast-in-place concrete slab and replacement of all partitions, finishes and systems (Mechanical, Electrical, Plumbing, Data/Communication and Fire Alarm) on the third floor. The work must be performed on the third floor while the shoring for the fourth floor remains in place. The fourth floor restroom slab repair and reconstruction of existing systems that were disturbed is to take place over the summer of 2020 while the building is closed for the summer and must be completed before fall 2020 move-in date. All other work is to take place immediately upon award of contract. Without further and detailed investigation of the existing conditions, the exact scope, and therefore cost, cannot be accurately determined at this time. Therefore, this project is limited to the following assumptions: • All demolition and new work will be confined to the 4,100 sf area of the lower level slab of the north wing of Gibbs Hall. • The design and temporary rerouting of utilities is only as needed due to the work being done on the lower level slab, utilities in other areas are not included in this proposal. • The new construction will be in compliance with current Florida Building code requirements. This includes, but is not limited to, sanitary systems, electrical systems, HVAC systems, fire alarm, fresh air systems, building sprinkler systems, data and communication systems.

Details

1 Dormitory, Approximately 4,100 SF Build-Out.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents