Similar Projects
CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

Riverside Fence
Infrastructure
Design
Colton, CA 92324

CA ERFO KLAMATH NF 17N11(1) Upper Doolittle & Mill Creek Bridges
Renovation, Infrastructure
Bidding
Apple Valley, Happy Camp, CA 96039

Speed Humps Project
Infrastructure
Bidding
$435,000 to $500,000 est. value
Redwood City, CA

Soundwall Repair and Replacement Services
Infrastructure
Post-Bid
$200,000 est. value
San Jose, CA

Rectangular Rapid Flashing Beacon Project
Infrastructure
Post-Bid
$200,000 est. value
Suisun City, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

2020 LNU Fire FHWA Guardrail Replacement Project
Infrastructure
Results
$1,800,000 est. value
CA

GCW Metal Barriers
Term Contract
Design
$250,000 to $500,000 est. value
Olympic Valley, CA 96146

HSIP 9 Foothill Boulevard and Macarthur
Infrastructure
Bidding
$1,746,249 est. value
Oakland, CA

Hood Los Alamos Entry Retaining Walls
Infrastructure
Post-Bid
Santa Rosa, CA 95409

Highway Safety Improvements Program (HSIP) No. 1 Signage Improvements
Infrastructure
Results
$26,000,000 est. value
CA

Ventura & 10th Site and Parking Lot Improvements -Phase II
Infrastructure, Alteration
Bidding
$1,639,640 est. value
Fresno, CA 93702

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

CZU Lightning Complex Guardrail Replacement Project
Infrastructure
Results
$600,027 est. value
Santa Cruz, CA

Reported 03/16/2022 12:00 AM
Project Title

Del Mar Middle School Traffic Calming Improvements

Physical Address View project details and contacts
City, State (County) Tiburon, CA 94920   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done, in general, consists of roadway repairs, including: remove and replace hot mix asphalt (HMA), constructing concrete sidewalk, curb and gutter, curb ramps and concrete islands; lowering and adjusting utility covers to finish grade, and traffic striping

Details

Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents