Similar Projects
Demilitarization (Demil) of Government Information Technology (IT) property in the Continental United States (CONUS)
Post-Bid

UIFB Snow Removal - Tams North
Post-Bid

Waste Containers With Trash Removal/Recycling Services
Term Contract
Results
Henrico, VA

Storm Debris Removal -Tree and Brush Removal Services
Term Contract
Results

Snow Removal VDOT Ashland Residency
Post-Bid

Timber Management Consultant
Term Contract
Results

Vacuum Leaf Pickup/Collection Services
Term Contract
Post-Bid
$679,630 est. value
Glen Allen, VA 23060

Debris Removal Services
Term Contract
Results

TSA Nitrile Gloves Recycling and Disposal
Post-Bid

CCA Treated Bridge Lumber
Results

Margarine Solids
Term Contract
Post-Bid
Sandston, VA 23150

Solid Waste Hauling Services
Term Contract
Results
$815,000 est. value
Henrico, VA

Snow Removal Services at DMV Motor Carrier Service Center
Term Contract
Post-Bid
Sandston, VA 23150

FOB Landfill Disposal
Term Contract
Results

Salt Pond Pumping Services
Term Contract
Post-Bid

Last Updated 07/03/2019 12:52 PM
Project Title

Soils Stockpile Removal and Disposal

Physical Address View project details and contacts
City, State (County) Henrico, VA 23273   (Henrico County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide the removal, hauling, and disposal of approximately 19,000 cubic yards of soil material from an existing, stabilized soil stockpile to include inspection and upkeep of erosion protection and sedimentation control during the work and final grading and restoration of the area following completion of material removal. Haul truck loads shall comply with and not exceed road loading criteria. Disposal of hauled soil material shall be to a disposal site approved by Henrico County that can legally accept the hauled soil material and has an approved Erosion and Sediment Control Plan.
Details
Division 41 - Material Processing and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents