Similar Projects
GHC Heritage Hall Boiler Project
Alteration
Bidding
Rome, GA 30161

Chiller Plant Replacement
Alteration
Bidding
Rock Spring, GA 30739

Beck Valves Parts and Ancillary Services
Term Contract
Post-Bid
Atlanta, GA

Walk In Cooler and Freezer
Post-Bid
Milledgeville, GA 31061

Petit Science Center Boiler 2 Burner Retrofit
Results
Atlanta, GA 30303

Submersible Pump
Results
Rome, GA 30162

Lifecycle Replacement 750-Ton Chiller
Alteration
Bidding
Savannah, GA 31405

Ellijay Elementary Walk-In Cooler
Post-Bid
Ellijay, GA 30540

Myers Middle School Boiler and Pumps Replacement
Results
Savannah, GA 31404

Science Center Boiler Replacement
Alteration
Bidding
Savannah, GA 31419

HVAC and Mechanical Maintenance Service
Term Contract
Post-Bid
Cartersville, GA

Boiler Replacement at Hightower Library
Results
$95,000 to $150,000 est. value
Barnesville, GA 30204

Chiller Maintenance and Repair Services
Alteration
Bidding
Augusta, GA 30906

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Administrative Center Mechanical and Roof Improvements
Results
Atlanta, GA 30339

Reported 03/23/2022 12:00 AM
Project Title

Cooler and Freezer Dry in Work

Physical Address View project details and contacts
City, State (County) Evans, Harlem, GA 30814   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Seal each seam of original flooring with butyl rubber. Install new diamond plate flooring on top of original flooring. Ensure metal edges are cut to ensure minimum gaps between the metal. Secure flooring with beveled stainless steel screws. Top of screws must be level with flooring. Seal all wall and ceiling seams with butyl rubber. Seal all corner seams top and bottom with butyl rubber. Seal all upper and lower outer seams with 2x2 insulation board covered with embossed metal to fit the 2x2 insulation board and 1” lip to secure with screws. Cover all wall seams with cork insulation. Cover all wall seams with embossed metal, bent to fit, and with a 1” lip to fasten to wall with screws. Silicone and seal all new installed metal. Install and seal a new 12 gauge threshold for each cooler and freezer door. Screws must be flush with top of metal. Please not to damage any heater installed around door.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Coolers, Walk-In Freezers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents