Similar Projects
Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Coastal Erosion Protection
Term Contract
Post-Bid
Barrow, AK

2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

2021 Bryson Avenue Bluff Erosion Repair
Infrastructure
Results
Kenai, AK 99611

Harbor Breakwater Navigation Improvements
Term Contract
Post-Bid
Craig, AK

Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Ninilchik Revetment Replacement
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Ninilchik, AK

Earthquake Repairs - Phase I & II
Infrastructure
Results
$1,500,000 est. value
Whittier, AK

Barrow Alaska Coastal Erosion Reduction
Alteration
Post-Bid
Less than $400,000,000 est. value
Barrow, AK 99723

Design-Build Services for Knutson Drive Critical Repairs
Infrastructure
Results
$800,000 est. value
Sitka, AK 99835

Furnish Cberrrsa Structures
Infrastructure
Post-Bid
Anchorage, AK 99501

Anchorage Golf Course Cart Path Repairs
Infrastructure
Results
$1 to $100,000 est. value
Anchorage, AK 99507

Trunk Road Railroad Overpass Drainage Repair
Infrastructure
Results
Less than $95,000 est. value
Palmer, AK 99645

Cormorant Way Road Improvements
Infrastructure, Alteration
Results
Less than $600,000 est. value
Wasilla, AK 99654

McCarthy Road MP 41 Crystal Creek Culvert Replacement
Infrastructure
Results
$500,000 to $1,000,000 est. value
Chitina, AK 99566

Reported 03/17/2022 12:00 AM
Project Title

Polychrome Area Improvements

Physical Address View project details and contacts
City, State (County) State-Wide: AK
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $35,000,000 to $45,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of spanning the active Pretty Rocks landslide with a 400 foot +/- long bridge. The work consists of: structure, grading, drainage, and erosion control. Work is split into schedules as follows: Schedule A is the base schedule for the earthwork portion of the project. This project will require a significant amount of earthwork to realign the Denali Park Road to accommodate the new bridge. Option 1 will include all work necessary to construct a 400 foot +/- long steel truss bridge across the Pretty Rocks landslide. This includes abutment preparation and construction, acquisition and assembly of the superstructure, temporary work platform, and erection of the bridge. Abutments are founded on drilled piles.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents