Similar Projects
Deep Injection Wells No. 3 and No. 4 Pump Station
Infrastructure
Post-Bid
$83,400,000 est. value
Hollywood, FL 33019

Well Rehabilitation
Term Contract, Infrastructure
Post-Bid
$750,000 est. value
Lauderdale Lakes, FL 33319

GTL Deepwell Electric Power Instrumentation and Control
Results
Fort Lauderdale, FL

Flygt Pumps Replacement/Repair Services
Results
Miramar, FL

High Service Pump Replacement at 1A Water Treatment Plant
Infrastructure
Post-Bid
$11,000 est. value
Lauderdale Lakes, FL 33319

By-Pass Pumps Maintenance
Results
Davie, FL

Pumping Services (Scheduled/Unscheduled)
Infrastructure
Post-Bid
$400,000 est. value
Fort Lauderdale, FL

Backwash Pump Replacement at 2A Water Treatment Plant
Results
Pompano Beach, FL 33064

SRWWTP Injection Wells 1 and 2 Mechanical
Infrastructure
Post-Bid
Hollywood, FL 33019

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
$164,450 est. value
FL

Well Water Pump and Motor Combination
Infrastructure
Results
Miramar, FL 33027

Transfer Pump Removal, Repair and Reinstallation
Alteration
Results
$19,989 est. value
Parkland, FL

Wastewater Reclamation Facility Monitor Well No. 2
Alteration
Results
$200,000 est. value
Miramar, FL 33027

High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Results
Southwest Ranches, FL 33331

Rehabilitation of Deep Injection Wells
Infrastructure
Results
$800,000 est. value
Miramar, FL 33025

Last Updated 06/15/2022 01:15 AM
Project Title

Water Supply Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Coral Springs, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the rehabilitation of raw water supply wells, including pre and post rehab downhole videos, gravel, acidization, development, performance testing, disinfection and removal and replacement of motor, pump and column pipe.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents