Similar Projects
Capital City Plaza - Phase II
New Construction - 550,000 SF
Conception
Atlanta, GA

Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

The Proctor
New Construction, Infrastructure - 142,000 SF
Bidding
$55,000,000 CJ est. value
Atlanta, GA 30318

The Proctor
New Construction, Infrastructure - 142,000 SF
Bidding
$55,000,000 CJ est. value
Atlanta, GA 30318

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

11th Circuit US Court of Appeals - Tuttle Chambers Renovation
New Construction, Renovation
Results
$1,000,000 to $5,000,000 est. value
Atlanta, GA 30303

980 Crest Valley Drive Stormwater Improvement Project
Infrastructure
Results
$279,562 CJ est. value
Atlanta, GA 30327

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Hotel Row - Sylvan Building
Renovation - 35,351 SF
Construction
Atlanta, GA 30303

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Parkside Shopping Center
New Construction
Conception
Sandy Springs, GA 30328

Last Updated 04/26/2023 03:05 PM
Project Title

Verizon Roswell 1 MEC Data Center

Physical Address View project details and contacts
City, State (County) Roswell, GA 30076   (Fulton County)
Category(s) Commercial, Green Building, Heavy and Highway
Sub-Category(s) Communication Building, LEED Certified, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include office space, equipment areas, a network equipment room and supporting power and cooling infrastructure areas. Construction is expected to happen in two phases. As of April 26, 2023, a building permit is pending and has not been issued. A general contractor has not been announced. Construction may begin summer 2023. *The owner and architect request no emails or phone inquiries. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 65,300 SF - 14,500 SF. 1 Story Above Grade, 50,800 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents