Similar Projects
Reported | 01/14/2022 12:00 AM |
Project Title | EHRM Infrastructure Tier 2 Design |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53295 (Milwaukee County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $16,290,900 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCOPE OF DESIGN The scope of this project is to provide the following infrastructure improvements to the Clement J. Zablocki VAMC: A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, conduct of studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system Data Center. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, requirement to create independent cost estimates, for the VA, for any modifications, for the attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A/E shall review the Contractor s requests for information and cost proposals for construction change orders when requested by the COR. The A/E s reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of Milwaukee MEDICAL CENTER record drawings and the EHRM infrastructure readiness assessment documents will be made available for A/E use; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. |
Details | Architectural, Renovation. |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |