Similar Projects
West Bloomfield Simsbury Phase 11 Watermain Replacement
Infrastructure
Bidding
West Bloomfield, MI

7 Mile Water Tower and Vault Modifications
Infrastructure
Bidding
Northville, MI

T4: Infrastructure
Post-Bid
Highland, MI

Lead Service Line Replacement
Infrastructure
Post-Bid
$5,000,000 est. value
MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Richland Gardens Area Water Main project
Results
Less than $4,021,000 est. value
Farmington, MI 48336

Replacement Water Main Phase II
Alteration
Post-Bid
Rochester, MI 48309

2020 DWSRF Water System Improvements Directional Drill
Results
Less than $2,673,290 est. value
Rochester, MI 48307

Royal Oak Township Lead Service Line Replacement
Alteration
Post-Bid
Ferndale, MI

Lead Service Line Replacement and Service Line Materials Verification Program
Results
Ferndale, MI

South Old Woodward Avenue Reconstruction Project (Phase 3)
Alteration
Post-Bid
$8,000,000 est. value
Birmingham, MI

2021 Water Main Improvement Project
Results
Less than $1,921,150 est. value
Ferndale, MI 48220

2022 Pavement Reconstruction & Water Main Replacement
Alteration
Post-Bid
Huntington Woods, MI

2021 Water Mains Axtell Drive, Maxwell Drive, Stutz Drvie
Results
Troy, MI 48084

Kenmore and Cornwall Water Main and Pavement Replacement
Infrastructure
Post-Bid
Berkley, MI

Last Updated 03/31/2022 07:52 AM
Project Title

Benstein Water Main Phase 1

Physical Address View project details and contacts
City, State (County) Commerce, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Benstein Road from McCoy Road to Glengary Road The Project consists of installing approximately 5,057 feet of 24” and 168 feet of 10” HDPE water main using directional drilling; connecting to existing 16” & 20” ductile iron watermains; using open cut installation for 40 feet of 8”, 19 feet of 16”, and 166 feet of 20” CL 54 Ductile Iron watermain; installing nine hydrants, five 20” gate valves, one 8” gate valve with associated structures including all associated testing. Work to also include removing and restoring asphalt paving with concrete curb and gutter in the RCOC ROW; installing 12” CMP with end sections; restoring landscape areas, and meeting any permit requirements as needed to provide a complete project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents