Similar Projects
Fox Road Storage
New Construction - 108,000 SF
Design
$10,000,000 CJ est. value
Raleigh, NC 27616

Eastern Wake Site General Education Building 1 and Student Services
New Construction - 110,000 SF
Bidding
$49,500 est. value
NC

NCSU Electrical Distribution
Renovation
Sub-Bidding
$47,211,000 est. value
Raleigh, NC

Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

Bee Safe Storage
New Construction, Demolition - 90,220 SF
Post-Bid
$3,491,388 est. value
Cary, Raleigh, NC 27606

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

Kioti Tractor Distribution Facility
New Construction, Demolition - 225,000 SF
Construction
$13,000,000 est. value
Wendell, NC 27591

Academic Success Center at DH Hill Library
Renovation - 40,000 SF
Construction
$9,300,000 est. value
Raleigh, NC

Bee Safe Storage and Wine Cellar
Renovation, Addition - 201,366 SF
Post-Bid
Morrisville, NC 27560

Elevator Additions - Tucker and Owen Residence Halls
Results
$1,400,000 est. value
Raleigh, NC 27695

Design Build for Restoration of Memorial Belltower
Construction
Less than $6,100,000 est. value
Raleigh, NC

NOAA Tenant Improvements
Post-Bid
Raleigh, NC 27606

NCSU Fountain Dining Hall
Renovation
Results
Raleigh, NC 27695

Holly Springs Self Storage
New Construction - 90,000 SF
Construction
$3,129,000 est. value
Holly Springs, NC 27540

Last Updated 05/05/2021 12:33 PM
Project Title

Facilities Operations and Warehouse Complex

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27600   (Wake County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Warehouse/Storage
Contracting Method
Project Status Construction Commenced December 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of labor, material, and equipment entering into the construction of WTCC Facilities Operations and Warehouse Complex, a 45,979 SF building including sitework, shops, warehouse, offices, equipment, MEP&FP, AV and security systems.

Details

1 College/University, Approximately 45,979 SF New Construction Building.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents