Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

New Fire Station No. 11 - FIR11 - City of Minneapolis
New Construction, Infrastructure
Conception
$9,144,000 CJ est. value
Minneapolis, MN 55414

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Tessman Ridge Apartments
New Construction, Infrastructure - 126,470 SF
Design
$20,400,000 CJ est. value
Brooklyn Park, MN 55445

Sport Courts and Site Improvements at Dickman Park
Infrastructure
Bidding
$391,370 CJ est. value
Minneapolis, MN 55413

Noise Wall and TMS
Infrastructure
Bidding
$2,000,000 CJ est. value
New Hope, MN 55428

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

Water Treatment Plant Dehumidifier Unit Replacement
Renovation
Post-Bid
$650,000 CJ est. value
Champlin, MN 55316

Grave Opening and Closing Services for Bloomington Cemetery
Term Contract
Results
Bloomington, MN

Minnehaha Park Refectory Site Improvements
Infrastructure
Results
Minneapolis, MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bde Maka Ska Refectory
New Construction, Infrastructure - 9,890 SF
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Duck Lake Trail (Dell Rd. to CR 4) - PE-8083 - City of Eden Prairie
Infrastructure
Conception
$3,390,000 CJ est. value
Eden Prairie, MN 55346

Last Updated 03/16/2023 08:04 AM
Project Title

Well House No. 17 and Transmission Main

Physical Address View project details and contacts
City, State (County) Eden Prairie, MN 55344   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,617,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project No: 02009-2021-003 The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: CONTRACT NO. 1 - EDEN PRAIRIE WELL HOUSE NO. 17 & TRANSMISSION MAIN Construction of Well House No. 17 & Transmission Main: Generally, includes the construction of a one room pump house containing piping, pumping, and electrical and mechanical appurtenances as well as the installation of approximately 1380 LF of transmission main connecting Well No. 17 to existing raw water main on Mitchell Road with horizontal directional drilling. All Bidders must certify they are a Responsible Contractor by signing a certification form stating they meet the minimum requirements under Minnesota Statute 16C.285. This form can be found in Section 00 43 29 of the project documents. Each Bid shall be accompanied by a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Minnesota, payable to the City of Eden Prairie, in a sum equal to five (5) percent of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license. All Bids will be made on the basis of cash or check payment for such Work. The Council reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the City. The City reserves the right to hold the three (3) lowest Bids for a period not to exceed sixty (60) days after the date of Bid opening. No bid may be withdrawn within 60 days from the date of bid-opening. The Work should be substantially completed by March 31, 2024 and shall be completed and ready for final payment on or before May 31, 2024. Project Category Code: Water Transmission Pipelines, Well Drilling/Pumphouses

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents