Similar Projects
Montessori School of Florence
New Construction
Conception
Florence, SC

Windhaven
New Construction
Design
Tega Cay, SC 29708

Bethel Presbyterian Church
New Construction, Renovation, Addition - 16,433 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clover, SC

2020 Remodeling of North Augusta Middle School Restrooms
Renovation
Bidding
North Augusta, SC 29841

MBIS Renovations for Records, Science Kits, and Adult Education
Renovation
Bidding
Myrtle Beach, SC 29577

New Lexington Middle School Replacement
New Construction - 213,500 SF
Sub-Bidding
Lexington, SC 29072

Dubose Middle School 2018 Additional Learning Cottages
Post-Bid
Summerville, SC

Construction Management at-Risk Services for Multiple Projects
New Construction, Renovation, Addition
Post-Bid
Lexington, SC

Renovate Old Middle School Into New District Office
Renovation
Results
SC

Decommissioning, Abatement and Demolition of Old Socastee Elementary School
Demolition
Results
Myrtle Beach, SC 29588

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

First Baptist Education Building
New Construction
Design
Charleston, SC 29401

ADA Renovations at Newberry High School and Mid Carolina Middle School
Renovation
Bidding
Newberry, SC 29108

2019 Operation Center Auto Shop
Post-Bid
Aiken, SC

Reported 03/22/2019 12:00 AM
Project Title

Gym Renovations at Williston-Elko High School and Kelly Edwards Elementary School

Physical Address View project details and contacts
City, State (County) Williston, SC 29853   (Barnwell County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description Renovate locker rooms,lobby,gym ceiling and other misc renovations for the Gym at Williston High School.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents