Similar Projects
PS/IS 288
Renovation
Conception
$2,400,000 est. value
Brooklyn, NY 11224

F-M High School Expansion
Addition
Conception
$52,000,000 est. value
Manlius, NY 13104

Salamanca CSD Improvements - Phase 3.4
Design
Salamanca, NY 14779

New District 31 Elementary School
New Construction
Design
Staten Island, NY 10314

Saugerties Central School District - District Wide Reconstruction Project - General Work Contractor
Renovation
Bidding
$16,000,000 CJ est. value
Saugerties, NY 12477

Saugerties Central School District - District Wide Reconstruction Project - General Work Contractor
Renovation
Bidding
$16,000,000 CJ est. value
Saugerties, NY 12477

Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Construction
$1,000,000 est. value
White Plains, NY 10606

Mamaroneck UFSD - 2019 Bond Referendum Capital Improvements at Chatsworth Avenue School
Construction
Larchmont, NY 10538

C-NS High School Renovations
Renovation
Conception
Cicero, NY 13039

Community Athletic Complex
New Construction
Design
Buffalo, NY 14216

West Seneca Central School District Capital Improvement Project 2018 Phase 3
Renovation
Bidding
$10,500,000 CJ est. value
West Seneca, NY 14224

Mamaroneck UFSD - 2019 Bond Referendum Capital Improvements at Mamaroneck Avenue School
Construction
Mamaroneck, NY 10543

Lakeshore Road Elementary School Renovation
Renovation
Conception
Cicero, NY 13039

Construction Management Services
Renovation, Infrastructure
Design
$72,184,922 CJ est. value
Syracuse, NY 13207

Coman Hill Water Service Replacement
Infrastructure
Bidding
$200,000 CJ est. value
North Castle, NY 10504

Last Updated 01/12/2023 04:05 PM
Project Title

2022 Capital Outlay Project

Physical Address View project details and contacts
City, State (County) Lima, NY 14485   (Livingston County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As found in the Bid Form, bidders must submit a separate sealed envelope with list of names and amounts to be paid to applicable HVAC, Plumbing and/or Electrical subcontractors. The list may not be changed unless the public owner finds a legitimate construction need, including a change in specifications or costs or use of a project labor agreement (PLA), and must be open to public inspection. Contractor shall be aware of the requirement under the Wicks 2008 law reform. The Architect for the Project is: SEI Design Group, D.P.C., 224 Mill Street, Rochester, NY 14614. The Construction Manager for the Project is: Campus Construction Management Group, 1241 Pittsford- Victor Road, Suite 104, Pittsford, New York 14534. Any Bidder upon returning such set-in good condition within thirty (15) days after Bid opening will be refunded the deposit. Any Bidder after thirty (15) days after Bid opening or Non-Bidder so returning such a set will not be refunded. The Board of Education hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the school district. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that, in the case the contract is awarded to him, he will then, ten days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to the provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed. Question Deadline 01/06/2023 All RFIs should be directed to the Construction Manager, Campus CMG, to the attention of Brian Bellaire, via e-mail: bbellaire@campuscmg.com.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents