Similar Projects
South Gate Police Department - HVAC Installation Project
Renovation
Sub-Bidding
$325,900 CJ est. value
South Gate, CA 90280

District Office Warehouse Cooler
Renovation
Sub-Bidding
$100,000 CJ est. value
City of Industry, CA 91745

Energy Modernization Program
Alteration
Post-Bid
$5,000,000 est. value
City of Industry, CA

HVAC Maintenance
Term Contract
Post-Bid
Alhambra, CA

Adult Education HVAC Replacement at Willow & Dibble Campuses
Renovation
Results
$2,457,000 CJ est. value
Hacienda Heights, CA 91745

Palomares Park HVAC System Replacement
Alteration
Results
$80,000 est. value
Pomona, CA 91767

Air Conditioning (AC) Optimization Program
Term Contract
Sub-Bidding
Los Angeles, CA 90012

District Office HVAC And Electrical Upgrades
Alteration
Post-Bid
$200,000 est. value
City of Industry, CA 91745

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

Fan, Cooling Tower Assembly
Alteration
Post-Bid
Los Angeles, CA

Ronald Reagan UCLA Medical Center (RRUMC) - Clinical Lab Humidification
Alteration
Results
$680,000 est. value
Los Angeles, CA 90095

CalSHAPE HVAC Services.
Alteration
Post-Bid
San Gabriel, CA

Sand Silo Air Filter Replacement
Renovation
Results
$192,700 CJ est. value
Los Angeles, CA 90065

Filter - A/C Return Air Grille, Evaporator
Alteration
Post-Bid
Los Angeles, CA

Soto Street Elementary School - Campus Wide HVAC Upgrade
Renovation
Results
$3,650,000 CJ est. value
Los Angeles, CA 90023

Last Updated 10/28/2023 07:34 AM
Project Title

Phase 1 City Hall HVAC Improvements

Physical Address View project details and contacts
City, State (County) El Segundo, CA 90245   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Phase 1 HVAC Improvements will consist of demolition and installation of two rooftop HVAC units. The units that are to be replaced consists of a 7.5-Ton package unit, A 40-Ton Multizone unit comprised of a rooftop AHU. Replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects and testing and commissioning. Work on the Project must be performed in strict conformity with Specifications No. PW 23- 03: Phase 1 City Hall HVAC Improvements Project which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity) as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Question Deadline 10/16/2023 at 4:00 PM PT Questions regarding the bid shall be submitted Electronically General Scope of Work: The scope of work consists of the demolition and installation of two Rooftop HVAC units. The units that are to be replaced consist of a 7.5-Ton package unit, a 40-Ton Multizone unit comprised of a rooftop AHU. The associated work consists of the following items: replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects as well as Testing and commissioning. 1-2. Location of the Work: The project will occur at City Hall, 350 Main Street, El Segundo, CA 90245 1-3. Working Days and Time for Completion: Contractor will commence work on date specified in the Notice to Proceed to be issued to the Contractor by City of El Segundo Public Works Department and shall complete work within Thirty (30) working days after the date of commencement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents