Similar Projects
Green Line Overhead Catenary System SGR
Alteration
Bidding
$7,729,085 est. value
Burlington, MA

On-Call Labour for Heating System/Boiler Repair, Plumbing Repair, Roofing/Building Envelope Repair, Refrigeration/HVAC Repair and Electrical Repair
Term Contract
Bidding
North Reading, MA

Whitney Pond Well 3 Chemical Feed & Control Facility - Sub-Bids
Alteration
Sub-Bidding
$300,000 est. value
Groton, MA

Boiler Replacement at Alcott Elementary School
Alteration
Sub-Bidding
$300,000 est. value
Concord, MA 01742

Digital Signage Solution
Term Contract
Post-Bid
Less than $120,000 est. value
Lowell, MA 01854

Hot Water Heater Replacement - General Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

FEMA Region 1 Emergency Alarm Panel Upgrade V2
Results
Less than $25,000 est. value
Maynard, MA 01754

Generator Maintenance
Term Contract
Results
Natick, MA

DC Fast Charging Stations Arlington Public Schools
Alteration
Bidding
Arlington, MA

Peabody School Chiller Replacement Project - Filed Sub Bid
Alteration
Sub-Bidding
$883,155 est. value
Cambridge, MA 02140

Hot Water Heater Replacement - Filed Sub Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Overhead Line Construction, Maintenance and/or Scheduled Distribution Line
Term Contract
Results
Less than $800,000 est. value
Reading, MA

Tobin Montessori and Vassal Lane Upper Schools Construction Project
Alteration
Sub-Bidding
$240,000,000 est. value
Cambridge, MA 02138

Underground Electrical Service - General Bids
Post-Bid
Tewksbury, MA 01876

750 MCM 15kV Power Cable
Results
Reading, MA

Last Updated 03/15/2022 09:33 AM
Project Title

Rooftop Unit (RTU-3) Replacement at Weston Middle School - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Weston, MA 02493   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. Removal of existing packaged DX, gas fired rooftop unit, electrical and automatic controls. Installation of new packaged DX, gas fired energy recovery rooftop unit, electrical, automatic controls and appurtenances. New gas piping and valve connection to rooftop unit. Factory startup and commissioning of new rooftop unit and applicable controls. Electrical: Electrically disconnect all mechanical equipment indicated to be removed. New power wiring to new mechanical equipment.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents