Similar Projects
ATV Trail Improvements - US Highway 53 to Trillium Road
Infrastructure
Post-Bid
MN

ATV Trail Improvements - Pfeiffer Lake Forest Road 256 to County Road 361
Infrastructure
Post-Bid
MN

Ash Boulevard Improvements
Results
Babbitt, MN 55706

2021 Citywide Patch and Sidewalk
Results
$250,000 to $300,000 est. value
Duluth, MN

E 4th St. Apartment Building
Renovation, Infrastructure
Pending Verification
Less than $1,100,000 est. value
Duluth, MN 55805

Mesabi Trail - CR88 to Ely
Infrastructure
Post-Bid
Ely, MN

Woodland Park and Ride Refurbishment
Results
$90,000 est. value
Duluth, MN 55803

Fairmount Snowmobile Trail
Results
Duluth, MN

Cross City Trail Relocation
Results
$200,000 est. value
Duluth, MN

Grading, Bituminous Surfacing, Utilities and ADA Improvements
Results
MN

Burntside Lake-Sandemar Public Water Access Parking/Access Upgrade
Results
$416,880 est. value
Ely, MN

Riverwest Drive Construction
Infrastructure
Results
Duluth, MN

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

Upgrade Parking Lot at IRRRB
Infrastructure
Results
$160,000 est. value
Chisholm, MN 55719

East Superior Street Reconditioning
Infrastructure
Results
Duluth, MN

Last Updated 05/24/2022 03:54 PM
Project Title

UMD Parking Lot S2 and S4 Construction

Physical Address View project details and contacts
City, State (County) Duluth, MN 55812   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide construction services to combine parking lots S2 & S4 located on the Duluth campus. The scope of the Project includes debris removal, erosion control, grading, soil compaction, aggregate base, curb and gutter, bituminous pavement, storm drainage utilities, landscaping restoration and landscape grading

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents