Similar Projects
FY20 Neches Salt Water Basin Stop Logs
Design
$1,000,000 to $5,000,000 est. value
Beaumont, TX 77703

Mcfaddin National Wildlife Refuge Beach Restoration Phase 2
Bidding
$55,400,000 to $66,800,000 est. value
Sabine Pass, TX 77655

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

USACE Galveston District, Sabine Neches Waterway PA11 Containment Dike Raise in Jefferson County, Texas
Post-Bid
$1,000,000 to $5,000,000 est. value
Beaumont, TX

Atlantic Canal Crossing Improvements 2nd Street thru 12th Street
Results
$5,180,000 est. value
TX

Port Arthur Hurricane Flood Protection Project (HFPP) Harvey Repairs in Jefferson County, Texas.
Results
$1,000,000 to $5,000,000 est. value
TX

Placement Area 18 Levee Project
Post-Bid
Port Arthur, TX 77642

Center Street Ditch Cleaning Project
Results
$37,500 est. value
TX

On-Call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Port Arthur, TX 77640

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Placement Area 9 Levee Project
Post-Bid
Port Arthur, TX 77642

Sabine Pass Area Drainage System Select Ditch Cleanout
Results
Sabine Pass, TX 77655

Placement Area 26 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Beaumont Municipal Airport Ditch Cleaning and Repair Project
Results
Less than $97,000 est. value
Beaumont, TX

Improvements to Cathodic Protection System for Bulkhead at Berths 3 & 4
Post-Bid
Port Arthur, TX 77640

Reported 06/17/2020 12:00 AM
Project Title

Improvements to Shamrock Ditch and Rodair Lateral 3

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77642   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes but is not limited to: - Clearing and grubbing of brush and trees within the DD7 right-of-way - Excavation and shaping of the existing channel to the lines and grades shown in the plans and preparation for concrete lining construction - Contractor may reuse topsoil and sod for the final grading and sodding activity as described in Bid Items - The placement of 6” concrete lining to the lines and grades shown on the plans - Final site clean-up and grading and the placement of Saint Augustine grass sod in all disturbed areas of the project as described in the plans and specifications

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents