Similar Projects
Bluefield Drive Area Water Line Improvements
Infrastructure
Conception
$3,750,000 est. value
Columbus, OH 43207

Lee Ellen Place Area Water Line Improvements
Infrastructure
Conception
$3,750,000 est. value
Columbus, OH 43207

SR 161 from I71 to Cleveland Avenue Phase 1
Infrastructure
Bidding
$1,400,000 est. value
Columbus, OH 43229

Market Survey DLA DSCC Water Line Renovation Project
Post-Bid
$1,000,000 to $5,000,000 est. value
Columbus, OH

Jackson Pike Backflow Upgrade and Replacement Project
Infrastructure
Post-Bid
Grove City, OH

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meter Installation FY 2019
Results
Less than $1,600,000 est. value
Columbus, OH

Roosevelt Avenue Area Water Line Improvements
Infrastructure
Conception
$3,450,000 est. value
Bexley, OH 43209

IRJCF Water Valve Sqeegie
Infrastructure
Post-Bid
Columbus, OH

Vernon Road Water Main Improvements
Results
Less than $2,029,881 est. value
Bexley, OH 43209

Miller Avenue Area Water Line Improvements
Infrastructure
Conception
$3,450,000 est. value
Columbus, OH 43227

Center Large Diameter Rehabilitation Project
Results
Columbus, OH

Brixham Road Water Line Improvements
Infrastructure
Conception
$3,450,000 est. value
Columbus, OH 43204

Mcgill Park Utility Improvements
Results
Less than $814,000 est. value
Canal Winchester, OH

Atwood Terrace Area Water Line Improvements
Infrastructure
Conception
$3,400,000 est. value
Columbus, OH 43227

Reported 05/14/2022 01:22 AM
Project Title

Wellington Boulevard Area Water Line Improvements

Physical Address View project details and contacts
City, State (County) Columbus, OH 43219   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $3,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is included City of Columbus FY 2021-2026 Budget CIP. As of May 13, 2022, further details regarding design and construction have not been identified.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents