Similar Projects
CO Omad 300(67) Minuteman Missile Access Roads
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
Grover, CO

Street Resurfacing Project
Infrastructure
Bidding
Mead, CO

United Fulton Augmentation Station Project
Post-Bid
Fort Lupton, CO 80110

WCR23/Great Western Trail Pedestrian Connection - Design and Consultation Service
Post-Bid
Severance, CO

Waterline Improvement Project - 2020
Results
Windsor, CO 80550

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

Asphalt Patching Project
Infrastructure
Bidding
Mead, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

2020 Waterline and Street Improvements
Results
Less than $100,000 est. value
Eaton, CO 80615

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Hidden Valley Parkway Extension
Results
$1,000,000 to $1,500,000 est. value
Severance, CO 80546

On Call Concrete Services
Infrastructure, Alteration
Post-Bid
Greeley, CO

Reported 03/16/2022 12:00 AM
Project Title

South Front Street Construction

Physical Address View project details and contacts
City, State (County) Platteville, CO 80651   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 03/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of South Front Street a two-lane gravel roadway approximately 5,260 LF in Platteville from Grand Avenue (WCR 32) along the east side of the UPRR to WCR 30. The construction will involve the installation of approximately 14,116 SY of 6" ABC, 257 SY of 6" Concrete Pavement, 68 LF of 36" RCP, 182 LF of 18" RCP, 2-36" FES, 12-18" FES, 8' x 24' Metal Cattle Guard, and the relocation of pipes and pump to a new tailwater pond. Work also includes removal and disposal offsite of approximately 254 SY of Concrete Slab, 98 SY of Asphalt, 110 LF od 12" CMP, 30 LF of 18" PVC, 34 LF of 18" CMP, 69 LF od Chainlink Fence, 28 LF of Wood Fence, Remove and Relocate 2-Water Meters and other miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents