Similar Projects
Last Updated | 04/03/2023 12:08 PM |
Project Title | Flooring Replacement - Wicomico Middle School Phase 1 - First Floor |
Physical Address | View project details and contacts |
City, State (County) | Salisbury, MD 21804 (Wicomico County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Brief Description of Work: Work consists of surface preparation and providing and installing replacement flooring for the first floor at Wicomico Middle School per the bidding documents. The existing flooring removal and disposal is to be performed by another contractor. The successful bidder will need to coordinate schedule removal and disposal contractor. Project Location: 635 East Main Street, Salisbury, Maryland The contractor or supplier who provides materials, supplies, equipment, and/or services for this construction project shall attempt to achieve the result that a minimum of ZERO percent of the total contract value is made directly or indirectly from certified minority business enterprises. All general contractors and subcontractors, including certified MBE firms, when bidding as general or prime contractors are required to attempt to achieve the MBE subcontracting goals from certified MBE firms approved by the Maryland Department of Transportation (MDOT). Certified Minority Business Enterprises are encouraged to respond to this solicitation notice. There will not be a Pre-bid Conference held for this project. The contractor or supplier agrees to make a good faith effort to carry out the MBE requirements of this contract in a manner which is consistent with the efficient performance of the project. Prevailing Wage Rates are not applicable to this project per the State of Maryland State Finance and Procurement Article, Section 17.201 through 17.226 and CoMAR 21.11.11. Questions Date: March 17, 2023, before 3:00 p.m. to ensure proper consideration. Work consists of surface preparation and providing and installing replacement flooring for the first floor at Wicomico Middle School per the bidding documents. The existing flooring removal and disposal is to be performed by another contractor. The successful bidder will need to coordinate schedule removal and disposal contractor. Each Bidder shall deposit with his proposal a Bid Bond in the amount of Ten Percent (10%) of the Base Bid. The form of the Bid Bond shall be AIA Document A310 Bid Bond - 1970 edition or equivalent. A Performance Bond and Labor and Material Payment Bond, in the full amount of the contract award shall be provided by the successful bidder prior to the execution of the contract. Bond Requirements are for projects greater than $100,000. (Bid Bonds and Payment and Performance Bonds are not required for Bids below $100,000.) No Bidder may withdraw their bid within ninety (90) days after the date and time of bid opening. The Board of Education may extend the time and place for the opening of bids by facsimile notification to those known general contract bidders who have obtained copies of the plans and specifications through the Printer. The Board of Education of Wicomico County reserves the right to reject any or all bids and waive formalities, informalities, and technicalities therein. The Board reserves the right to contact a Bidder for clarifications and may, at its sole discretion, allow a Bidder to correct any and all formalities, informalities and technicalities in the best interest of the Board. The Board reserves the right to utilize existing Board or Cooperative contracts in the best interest of the Board. The Board reserves the right to evaluate existing Board or Cooperative contracts as Bids in the best interest of the Board. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated value range for this project is $250,000 to $400,000. Scope- Replacement of flooring finishes at select areas of first floor. Floor preparation includes two (2) skim coats at all work areas prior to installation of new finishes. |
||
Details | 1 Story Above Grade, 59,487 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |