Similar Projects
Last Updated 02/12/2020 04:48 AM
Project Title

Preservation - District 2

Physical Address View project details and contacts
City, State (County) (Anderson, Edgefield, Greenwood, Newberry, Saluda Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 00 1.000 Ls Removal & Disposal Of Existing Pavement 175.000 Sy Borrow Excavation 743.000 Cy Maintenance Stone 125.770 Ton Liquid Asphalt Binder Pg64-22 204.969 Ton Full Depth Asph. Pav. Patching 4" Unif. 687.000 Sy Full Depth Asph. Pav. Patching 6" Unif. 5,990.000 Sy Full Depth Asph. Pav. Patching 8" Unif 4,375.000 Sy Full Depth Asph. Pav. Patching 12"Unif 150.000 Sy Milling Existing Asphalt Pavement 1.25" 14,970.000 Sy Milling Existing Asphalt Pavement (Variable) 22,730.000 Sy Milled-In Rumble Strip 31.512 Mi Hot Mix Asphalt Surface Course Type d 2,966.732 Ton Preventative Maintenance Surface Treatment 242,517.000 Sy Driveway Paving-Surface Type d 146.250 Ton Permanent Construction Signs (Ground Mounted) 6,272.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 10,750.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 584,960.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 6,088.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 5,800.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 40.000 Ea White Word Message "Only"-Fast Dry Paint 24.000 Ea Railroad Crossing Symbols - Fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 9,740.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 599,118.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,600.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 3,089.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 193,380.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,525.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,757.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 10.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 6.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 4,090.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 198,205.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 198.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 6.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,515.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 153.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 2,676.000 Lf Sawcut For Loop Detector 843.000 Lf 13"x24"x12"d.Elec.Flush Undgrd.Enclosure-(Str.Poly.Conc.)Hd 3.000 Ea 24" Smooth Wall Pipe 48.000 Lf Detectable Warning Material 87.500 Sf Pedestrian Ramp Construction 175.000 Sy Surface Applied Detectable Warning 60.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 4.887 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents