Similar Projects
Last Updated | 12/05/2019 02:43 PM |
Project Title | Deer Creek Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Harvey, MI 49855 (Marquette County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $163,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and dispose of the existing timber bridge structure and timber abutments. The existing timber structure spans roughly 15’ and is one lane (~10’) wide. The structure is located on the Willow Creek Road over Deer Creek. The structure will be replaced with an aluminum box culvert. The complete work scope will include all associated work such as excavation, backfill, concrete foundations, riprap wing walls and scour protection, a new gravel road surface over the bridge, slope restoration, and erosion control measures. To provide access to the other side of the bridge during construction. The detour route is on the existing snowmobile trail. It will need some repairs including, but not limited to, filling low areas from an onsite pit, grading, mowing, tree removal, and hauling in gravel. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |