Similar Projects
Twinwood Parkway Phase 1B, Segment C-D
Bidding
McKinney, TX 75072

Phase 1 and 2 - Grading Package for Tillage Farms East
Bidding
TX

Golf Course Infrastructure Repairs – Phase II
Post-Bid
Plano, TX 75025

Retaining Wall Surface Finish Improvements
Term Contract
Post-Bid
$3,400,000 est. value
Plano, TX 75093

Trinity Falls Melissa Road Grading Package
Results
Melissa, TX 75454

Chapman Raw Water Transmission Pipeline Channel Stabilization at the South Sulphur River Crossing Phase 2
Results
$783,000 est. value
Wylie, TX 75098

Cedar and Utah Drainage Improvements
Bidding
Celina, TX

Pond Maintenance III
Post-Bid
Plano, TX 75023

Phase 3 Grading Package for Bridgewater
Results
Princeton, TX 75407

Three Cities Trail Gabion Wall and Slope Stabilization
Post-Bid
Frisco, TX 75034

Old Stone Dam Upstream Bank Stabilization
Results
Allen, TX 75013

Pond Maintenance Group 1
Post-Bid
$40,000 est. value
Plano, TX 75025

Allenwood Drainage Improvement at Dart Crossing
Results
Allen, TX 75013

Erosion Control at Various Locations - Phase 3
Post-Bid
Dallas, TX

Mckinney National Airport
Results
McKinney, TX 75069

Last Updated 04/13/2021 11:08 AM
Project Title

Joe Pool Lake Slide Repair

Physical Address View project details and contacts
City, State (County) Dallas, TX 75249   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish and provide all labor, materials, tools, transportation, supplies, and equipment necessary to remove slide material at upstream and downstream slopes of Joe Pool Dam, bench-cut into undisturbed embankment on both sides of the slides, excavate material at the toe beneath the slope, replace embankment and foundation material with lime-treated material, and repave the repaired section of the crest.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents