Reported | 12/28/2018 10:06 AM |
Project Title | DFCM Construction-DABC New Herriman Liquor Store |
Physical Address | View project details and contacts |
City, State (County) | Herriman, UT (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Site Development |
Contracting Method | |
Project Status | Construction Commenced 2018 |
Bids Due | View project details and contacts |
Estimated Value | Less than $3,100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Development of the site will include new utility connections to off-site utilities and parking for a minimum of 50 stalls. Water, sewer, storm drains, and other utilities will be available adjacent to the site as part of the Herriman Main Street extension due to commence in February 2018. Tie-ins are anticipated to be provided by the developer so as not to disturb the new road. A storm-water detention pond, either above or below the surface will be required. The Herriman Main Street extension will provide the main approach to the store, with Anthem Blvd providing secondary accessibility. Deliveries for the store will be accomplished via a 48 inch loading dock on south side of the store near the east corner. | ||||||||||||||
Details | 1 Retail, 1 Story Above Grade, 13,600 SF New Construction 1, 1.55 Acres.
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |