Similar Projects
Salt Lake City New Water Reclamation Facility Project
Sub-Bidding
Less than $400,000,000 est. value
Salt Lake City, UT

Rozel State 18 Well Plug
Post-Bid
Less than $1,674,000 est. value
Salt Lake City, UT

Utah State Correctional Facility Gmp 2.02 Rough Grading and 2.03 Deep Utilities
Post-Bid
Salt Lake City, UT 84116

Z--(Con)(660) Demolish Building 1 G Zone (Va-18-00075144)
Demolition
Results
Salt Lake City, UT

Main Street Property Development
Results
Less than $120,000 est. value
Midvale, UT

Trucking Yard
New Construction
Pending Verification
Magna, UT

Dutton Cement Work
Post-Bid
Salt Lake City, UT

City Hall Entry Improvements Project
Results
Riverton, UT

Magna Main Street Multiple Site Development
Post-Bid
Magna, UT

Frontage Improvement Project
Results
Riverton, UT 84065

Discovery UPC
Post-Bid
$50,000 est. value
Salt Lake City, UT 84104

Saratoga Springs - Road Development
Results
Less than $6,250,000 est. value
Salt Lake City, UT 84045

Adesa Auto Auction
Renovation
Post-Bid
$550,000 est. value
Salt Lake City, UT 84104

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Demolition of Buildings and Site Improvements
Demolition
Results
Less than $50,000 est. value
Salt Lake City, UT

Reported 12/28/2018 10:06 AM
Project Title

DFCM Construction-DABC New Herriman Liquor Store

Physical Address View project details and contacts
City, State (County) Herriman, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Construction Commenced 2018
Bids Due View project details and contacts
Estimated Value Less than $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Development of the site will include new utility connections to off-site utilities and parking for a minimum of 50 stalls. Water, sewer, storm drains, and other utilities will be available adjacent to the site as part of the Herriman Main Street extension due to commence in February 2018. Tie-ins are anticipated to be provided by the developer so as not to disturb the new road. A storm-water detention pond, either above or below the surface will be required. The Herriman Main Street extension will provide the main approach to the store, with Anthem Blvd providing secondary accessibility. Deliveries for the store will be accomplished via a 48 inch loading dock on south side of the store near the east corner.
Details 1 Retail, 1 Story Above Grade, 13,600 SF New Construction 1, 1.55 Acres.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents