Similar Projects
Southern Pump Station Project
Infrastructure
Bidding
$6,200,000 est. value
El Centro, CA 92244

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Bidding
Anaheim, CA

Grayson Well 69 (Replacing Well 274)
Infrastructure
Post-Bid
$2,449,000 est. value
Grayson, Modesto, CA 95363

Chilled Water Pump Project
Infrastructure
Post-Bid
Marysville, CA 95901

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Bidding
Colton, San Bernardino, CA 92324

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Post-Bid
Elk Grove, CA

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Bidding
Long Beach, CA 90899

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$114,000 est. value
Napa, Suisun City, CA 94585

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Plumas National Forest Brush Creek Fuel Pump Repair
Term Contract
Bidding
$25,000 to $100,000 est. value
Berry Creek, CA 95916

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$255,000 est. value
Davis, CA 95618

Install Chill Water Pumps
Term Contract
Bidding
CA 95652

Last Updated 09/08/2021 08:39 AM
Project Title

Well Abandonment Project

Physical Address View project details and contacts
City, State (County) Riverside, CA 92519   (Riverside County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents