Similar Projects
Last Updated | 06/12/2021 01:26 AM |
Project Title | Pavement patching from 0.1 mile South of Pierce Ave. to Bauer Parkway in Rockford |
Physical Address | View project details and contacts |
City, State (County) | IL (Winnebago County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 44200050 Sq Yd Welded Wire Reinforcement Base Items 1,290.000 44200970 Sq Yd Class b Patches, Type Ii, 10 Inch Base Items 1,632.000 44200974 Sq Yd Class b Patches, Type Iii, 10 Inch Base Items 960.000 44200976 Sq Yd Class b Patches, Type Iv, 10 Inch Base Items 330.000 44201299 Each Dowel Bars 1 1/2" Base Items 5,205.000 44213200 Foot Saw Cuts Base Items 13,796.000 44213204 Each Tie Bars 3/4" Base Items 553.000 67100100 l Sum Mobilization Base Items 1.000 70100320 l Sum Traffic Control And Protection, Standard 701422 Base Items 1.000 70102630 l Sum Traffic Control And Protection, Standard 701601 Base Items 1.000 70102635 l Sum Traffic Control And Protection, Standard 701701 Base Items 1.000 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |