Similar Projects
Resurfacing of Second Avenue - Phase II
Infrastructure
Bidding
Galloway, NJ 08205

Access Stairway at Oriental Avenue and the Boardwalk
Infrastructure
Bidding
Atlantic City, NJ

2019 State Aid Improvement of River Road
Post-Bid
Galloway, NJ

2020 Accessible Ramp Installation at Various Intersections
Post-Bid
Ventnor City, NJ 08406

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Fairmount Avenue Improvement
Results
$296,643 est. value
Atlantic City, NJ 08401

County Justice Facility Kitchen Area Parking Lot Resurfacing
Infrastructure
Bidding
Mays Landing, NJ

2019 New York Avenue Road Reconstruction
Post-Bid
Mays Landing, NJ 08330

Hammonton Bike Path Extension
Results
$279,448 est. value
Hammonton, NJ 08037

Construction Management and Inspections Caspian Pointe Pedestrian and Bicycle Connection
Post-Bid
Atlantic City, NJ

FY 2019 NJDOT Trust Fund Multi-Use Trail at Albertson Memorial Park project
Results
Magnolia, NJ 08049

Masonry and Concrete Curbs and Sidewalks
Post-Bid
Egg Harbor Township, NJ 08234

Shoulder Widening of the Garden State Parkway Milepost 30 to 35
Results
Egg Harbor Township, Somers Point, NJ

Asphalt Repaving
Post-Bid
Egg Harbor Township, NJ 08234

For the Installation and Construction of the Margate-Ventnor Bicycle Infrastructure in the Cities of Margate and Ventnor
Results
NJ

Last Updated 08/19/2021 04:20 PM
Project Title

Atlantic City Expressway Connector, Route 30, Route 87 and Route 187 Resurfacing Program

Physical Address View project details and contacts
City, State (County) Atlantic City, NJ 08405   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Atlantic City Expressway Connector, Route 30, Route 87 & Route 187 Resurfacing Program consists of furnishing all labor, equipment, and materials and performing all work required to resurface the roadways including shoulders. Work includes the installation of ADA curb ramps, concrete curb replacement and roadway striping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents