Similar Projects
Woodhurst Addition Pole Rehabilitation Phase III
Alteration
Post-Bid
Fort Wayne, IN

Engineering Technology and Computer Science Building Corridors Finish Stairs and Lighting Renovation - 2022
Alteration
Post-Bid
Less than $2,000,000 est. value
Fort Wayne, IN

Adams Elementary Security and Lighting Improvements
Alteration
Results
$1,300,000 to $1,500,000 est. value
Fort Wayne, IN

Fairfield Lighting Improvements Phase IV
Alteration
Results
Fort Wayne, IN 46895

Transformer Equipment
Alteration
Post-Bid
Fort Wayne, IN

New Haven Public Works Solar Array
Alteration
Results
New Haven, IN 46774

Switchgear/Control House Requirements
Alteration
Post-Bid
Fort Wayne, IN

2022 Electrical PPI
Alteration
Results
Fort Wayne, IN

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

FLP to WWPS Power Resiliency Phase I
Alteration
Results
$300,000 est. value
Fort Wayne, IN

Install a Localizer Antenna on Runway 32 at the Fort Wayne International Airport
Infrastructure
Post-Bid
$200,000 CJ est. value
Fort Wayne, IN 46809

St. Joe Dam PLC Replacement Project
Alteration
Results
$3,000,000 est. value
Fort Wayne, IN

Adams Elementary Security and Light­ing Improvements
Renovation
Post-Bid
$120,000 CJ est. value
Fort Wayne, IN 46803

Goshen Road Roundabout Lighting improvements
Infrastructure
Results
$29,902 CJ est. value
Fort Wayne, IN 46818

Covington Road and West Hamilton Road Intersection Signalization
Infrastructure
Post-Bid
$300,000 CJ est. value
Aboite Township, IN 46814

Last Updated 05/15/2023 07:39 PM
Project Title

Bunche Elementary School Rooftop Unit Replacement Project

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Primary Engineering, Inc. Bids shall be received from a single prime contractor. Bids received after that time or in another location shall be returned to the bidder unopened. Only complete sets of plans and specifications will be distributed. Unlocked electronic PDF sets of drawings will be available for an additional cost. Any unsuccessful bidder, upon returning such sets in good and usable condition within (10) ten days of the bid date will be refunded their deposit. There will be shipping and handling charges for the delivery of each set or Bidding Documents. Each bid shall be accompanied by a certified check, a cashiers check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashiers check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents