Similar Projects
On-Call Emergency Repairs for Horizontal Utilities (Water, Sewer and Drain)
Infrastructure
Bidding
$150,000 est. value
Plymouth, MA

Catch Basin Cleaning Services
Term Contract
Post-Bid
Hanover, MA

Sea Street and Smith Avenue Sewer System Rehabilitation
Post-Bid
Wareham, MA 02571

Pipeline Cleaning and CCTV Assessment
Results
Less than $50,000 est. value
Plymouth, MA

Waste Pipe Replacement, Tea Rock Gardens 667-1
Results
Less than $236,000 est. value
Marshfield, MA 02050

On Call Service Calls, Drain Cleaning
Post-Bid
$150,000 est. value
Brockton, MA

Cedar Point Gravity Sewer Replacement
Results
Less than $7,800,000 est. value
Scituate, MA

FY 22 Catch Basin Cleaning Services
Term Contract
Post-Bid
Hanover, MA

Septic Pumping Services for Schools and Municipal Buildings for FY21
Results
Less than $50,000 est. value
Hanover, Newburyport, MA 01950

2019 Sewer System Rehabilitation Hovendon Avenue Sewer Replacement
Results
Less than $2,500,000 est. value
Brockton, MA 02301

Sewer and Drainage Improvements
Results
Less than $790,000 est. value
Hull, MA

Furnishing and Installing approximately 1,000 LF of 18" Diameter PVC and HDPE
Results
Less than $985,000 est. value
Plymouth, MA 02360

Rehabilitation of 1,815 Linear Feet of Sanitary Sewers Via Cured-In-Place Pipe (CIPP)
Results
Less than $1,000,000 est. value
Wareham, MA

Manhole Rehabilitation Project Phase 2
Results
$220,713 est. value
Abington, MA 02351

Year 2 Sewer System Improvements
Results
Less than $140,000 est. value
Marion, MA 02738

Last Updated 06/08/2021 10:42 AM
Project Title

Septic System Replacement

Physical Address View project details and contacts
City, State (County) Norwell, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,098,000
Plans Available from Municipal Agency - 05/19/21
Owner View project details and contacts
Architect View project details and contacts
Description

Septic work for this project includes abandoning existing septic system and all components, installing new septic tanks, pumps and pressure dosing septic system, sewer manholes and PVC sewer main. Other associated work includes installation of backup generator, electrical cabinet, electrical conduit, roadway and sidewalk reclamation and reconstruction, removing and resetting granite curbing, installation of new water and drain mains and removal of AC water and sewer mains

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Gasoline Piping.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents