Similar Projects
Home Sweet Home Day Care Addition
Addition, New Construction, Infrastructure - 666 SF
Conception
$300,000 CJ est. value
Farmingdale, NJ 07727

Meinzer Street Yeshiva Development
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Aberdeen Township, NJ 07721

Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

Holly Boulevard Apartments
New Construction, Infrastructure
Design
$57,000,000 CJ est. value
Wall Township, NJ 08736

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Hyde Park Apartments / Marlboro
New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
Marlboro Township, NJ 07751

Encoder Registers, Cold Water Meters and Radio Frequency Meter Interface Units
Infrastructure
Post-Bid
Belmar, NJ 07719

New Regional Sewage Pump Station, Force Main and East Interceptor for the Oceanport Section of Fort Monmouth Project
Infrastructure
Post-Bid
Monmouth Beach, NJ

Drainage and Sump Pump Improvements at Monmouth Avenue and Burlington Avenue
Infrastructure
Results
Bradley Beach, NJ 07720

Water Materials for Maintenance and Repairs
Infrastructure
Results
Aberdeen, NJ

Improvements to Ryan Road (NJDOT Municipal Aid FY 2021)
Infrastructure
Construction
$478,140 CJ est. value
Manalapan, NJ 07726

Improvements to Ryan Road (NJDOT Municipal Aid FY 2021)
Infrastructure
Construction
$478,140 CJ est. value
Manalapan, NJ 07726

Dr. James Parker Boulevard Distribution Facility Addition
Addition, Demolition, Infrastructure
Pending Verification
$750,000 CJ est. value
Red Bank, NJ 07701

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

The Evangelical Church of the Assemblies of God
New Construction, Infrastructure - 18,800 SF
Conception
$6,100,000 CJ est. value
Manalapan, NJ 07726

Last Updated 03/20/2023 08:42 AM
Project Title

Pleasure Bay Crossing and Main Pump Station (MPS) Replacement Project

Physical Address View project details and contacts
City, State (County) Oceanport, NJ 07757   (Monmouth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $111,180,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT 200: The scope of work consists of a single prime contract for: procurement and any subcontracting; general requirements, acquisition of local permits and approvals not provided by the owner, Maintenance of Plant Operations (MOPO), selective demolition, pile driving, earthwork, deep excavations, shafts, shoring and bracing, tunneling, utilities, concrete, masonry, metals, carpentry, thermal and moisture protection, openings, finishes, fire suppression, pumps, plumbing, cranes and hoists, HVAC, electrical, process and Plant control systems interconnections, process control systems testing and integration, paving, exterior improvements and landscaping for the construction of the Pleasure Bay Crossing and Main Pump Station Replacement. From the original solicitation: TRWRA Contract 200 entails construction of two new interceptors, a 30-inch diameter Monmouth Beach Interceptor (MBI) approximately 950-feet, a 54-inch diameter Pleasure Bay Interceptor (PBI) approximately 3,250-feet; and construction of a new 50-mgd MPS with a 36-inch force main approximately 700-feet extending to the Plant's existing headworks facility. The project will also entail diverting the Plant's existing supernatant flow by gravity to the new MPS, as well as demolition of the existing main pump station and supernatant pump station, which will no longer be needed. The Contract will also include the construction of a new Electrical Building and Odor Control System to service the new 50-mgd MPS along with associated site improvements. TRWRA Contract 200 is located in the Boroughs of Oceanport and Monmouth Beach, Monmouth County, New Jersey. The project is being funded by the New Jersey I-Bank: Water Bank Financing Program (NJ IBANK Project No. S340117-10). The Project will be publicly bid and will be completed under the supervision of a Prequalified Contractor that will be contracted directly with the TRWRA. Only Prequalified Contractors will be allowed to bid on TRWRA Contract 200. The scope of work consists of a single prime contract for: procurement and subcontracting, general requirements, acquisition of local permits and approvals not provided by the owner, Maintenance of Plant Operations (MOPO), selective demolition, pile driving, earthwork, deep excavations, shafts, shoring and bracing, tunneling, utilities, concrete, masonry, metals, carpentry, thermal and moisture protection, openings, finishes, fire suppression, pumps, plumbing, cranes and hoists, HVAC, electrical, process and Plant control systems interconnections, process control systems testing and integration, exterior improvements and landscaping for the construction of the Pleasure Bay Crossing and Main Pump Station Replacement according to the Project Contract Documents and Contract Drawings. The principal activities for the Prequalified Contractor involved in this project include: (1) Project supervision, oversight, safety, administration, and coordination of all subcontractors including a Tunneling Subcontractor (2) MOPO including provision of temporary raw wastewater by-pass pumping systems and controls for the PBI and MBI in residential areas (3) Pile driving, deep excavations, dewatering, sheet piles, shoring and bracing required for an approximate 105-ft Deep Launch Shaft/ Pump Station with an approximate 75-ft Shaft Diameter. (4) Pile driving, deep excavations, dewatering, sheet piles, shoring and bracing required for an approximate 90-ft Deep Reception Shaft with an approximate 30-ft Shaft Diameter. (5) Foundations, structural concrete and steel for the Launch Shaft/ Pump Station and Reception Shaft. (6) An approximate 3,250-foot long tunnel to be installed by a 10-foot maximum diameter tunnel boring machine (TBM) to connect the launch and reception shafts. This will include initial ground support with circular steel ribs and timber lagging within the tunnel. (7) Offsite hauling and disposal of all tunneling and shaft excavation spoils. (8) Construction of a new 54-inch PBI gravity interceptor/ carrier pipe within the new approximate 3,250-foot long tunnel with associated cellular concrete annular backfill. (9) Construction of a 50 MGD Wastewater Pump Station and 36-inch force main (10) 30-inch gravity MBI and public Right Of Way/ easement work (11) Open Channel Grinders (12) Submersible Non-Clog Main Sewage Pumps (13) Odor Control System (14) Electrical Building (15) Equipment start-up and training. At a minimum, the prospective bidders for TRWRA Contract 200 will be required to during the Prequalification process to demonstrate verifiable, successful experience in Project Supervision and Administration on projects similar in scope to the Pleasure Bay Crossing and Main Pump Station Replacement. At a minimum the contractor shall demonstrate experience in the completion of work involving a 40 MGD or larger Wastewater Pump Station, 80-ft deep shafts, 20-ft shaft diameters, shoring/ bracing, dewatering, spoils hauling and disposal, 7-16-ft diameter and minimum 3,000 linear feet in length tunnel construction with open face Tunnel Boring Machine (TBM) including experience with tunneling work involving ground support with circular steel ribs and timber lagging, associated carrier pipe installation and cellular concrete backfill, 24-in Gravity Interceptor, and 24-inch or larger Force Mains. This experience shall include at least two (2) projects of similar activities and scope of work as the subject project completed within the past ten (10) years. The total cost of Wastewater Pump Station work performed by the prospective bidder on each project must be a minimum of $20,000,000. Additionally, the total cost of Tunneling work performed by the prospective bidder (or non-exclusive specialty subcontractor) on each project must be a minimum of $5,000,000.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents