Similar Projects
Furnace Replacement - Fort Duchesne, UT 84026
Term Contract
Bidding
Fort Duchesne, UT 84026

Removal and Installation of 6 Ton HVAC Unit for One Building
Post-Bid
Price, UT

RTU Replacement
Post-Bid
Marriott-Slaterville, UT 84404

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

Kitchen Vent Hood Inspection and Cleaning
Post-Bid
Sandy, UT 84093

Construction Manager/General Contractor Services for Leisure Pool Roof Decking, Interior Panels and Pool Air Handlers
Results
Less than $1,600,000 est. value
Bountiful, UT 84010

CM/GC Administration Building HVAC Renovation
Post-Bid
Farmington, UT 84025

Woodstock Elementary, VAV Reheat Boxes
Results
Less than $50,000 est. value
Murray, UT 84121

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

Construction: Oakwood Elementary, VAV Reheat Boxes
Results
Holladay, UT 84121

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

HVAC Filters - Contract
Term Contract
Results
Less than $1,000 est. value
Clearfield, UT

Simmons Building HVAC Upgrade
Post-Bid
Kaysville, UT 84037

Eccles HVAC Fans and Tab
Results
Less than $225,000 est. value
Sandy, UT

Reported 04/02/2022 12:00 AM
Project Title

Replacement of the Cooling Tower at the Dixie Convention Center

Physical Address View project details and contacts
City, State (County) Saint George, UT 84790   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals must include the removal and discarding of the old cooling tower, a suitable replacement for the old cooling tower, and the installation of the new cooling tower, with all the pipes, joints, elbows, connectors, etc., needed to connect the new cooling tower to the existing HVAC Chillers inlet and returns and water hookups. Must include freight charges, any factory authorized start-up services, and a timeline during which the work will be completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents