Similar Projects
Preventive Maintenance on Chillers
Post-Bid
Shiprock, NM 87420

Water Production Facilities Electrical and Mechanical Assessment and Evaluation
Post-Bid
$150,000 est. value
Los Alamos, NM

J--Abq 501-20-1-0157-0001 Millipore Water Systems Maintenance (Va-19-00035079)
Results
Albuquerque, NM 87108

Lydia Rippey Elementary School Boiler Replacement 2020
Results
Aztec, NM 87410

Mechanical, Electrical, and Plumbing Job Order Contract
Term Contract
Post-Bid
Clovis, NM

Providing Maintenance for all Mechanical Equipment
Results
Pecos, NM 87552

Boiler Fuel/Gas Train Replacement
Post-Bid
Crownpoint, NM 87313

Mechanical-Electrical-Plumbing (MEP) IDIQ - Plains Area - South
Results
$2,000 to $25,000,000 est. value
Las Cruces, NM - Bushland, College Station, Houston, Kerrville, Lubbock, Temple, TX

Navajo Regional Behavioral Health Center Hot Water Heaters Inspection, Repair, and Preventive Maintenance Project
Alteration
Post-Bid
Shiprock, NM

Medical Gas Repair for the Northern Navajo Medical Center
Results
Shiprock, NM

Aquatic Center Mechanical System Replacement Project
Results
Raton, NM 87740

Convention Center Boiler Project
Results
$80,000 est. value
Raton, NM 87740

Preventive Maintenance and Repairs of Water Treatment
Results
Albuquerque, NM

Brand Requirement - Purchase, Replace and Humidifier Located at The National Weather Service (NWS) Weather Forecast Office (WFC) Santa Teresa, NM 88008
Results
Santa Teresa, NM 88008

Z--Boiler Repair at WES
Term Contract
Results
Fort Wingate, NM 87316

Last Updated 10/14/2021 04:30 PM
Project Title

Environmental Monitoring System

Physical Address View project details and contacts
City, State (County) Kirtland, NM 87117   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of an existing environmental monitoring system and installation of a new environmental monitoring system that will: 1) monitor the temperature within various areas of the facility, 2) monitor areas beneath raised computer flooring for the presence of water, and 3) monitor the performance of the boiler. When specifications for temperature, the presence of water, or boiler performance are exceeded, the system will send an email and text message to alert the facility custodian(s) of the problem.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 42 - Process Heating, Cooling, and Drying Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents