Similar Projects
Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Concrete Pad replacement and Concrete Sidewalk and Pad
Infrastructure, Alteration
Results
$300,000 est. value
Culver, OR

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

2022 City Wide Voluntary Sidewalk and Concrete Repair Projects
Infrastructure, Alteration
Results
$100,000 est. value
La Grande, OR

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Structures & Paving I-5: Azalea- Glendale Section
Infrastructure
Results
$11,546,983 CJ est. value
Roseburg, OR 97470

SW 4th Avenue Improvement Project
Infrastructure
Post-Bid
$1,515,040 CJ est. value
Portland, OR 97239

Osborn Aquatic Center Natatorium Roof Replacement Project
Renovation
Results
$133,390 CJ est. value
Corvallis, OR 97330

Office Remodel - Oregon Department of Transportation District 11 Office
Build-out
Post-Bid
$350,000 CJ est. value
Klamath Falls, OR 97603

Main Campus Takena Elevator and Phase II Remodel Project
Build-out, Renovation
Results
$470,000 CJ est. value
Albany, OR 97321

RFP D/B - North Park Blocks Extension
Addition, Demolition, Infrastructure
Post-Bid
$4,900,000 CJ est. value
Portland, OR 97204

Fairgrounds Gazebo Construction
Infrastructure
Results
$694,000 CJ est. value
Grants Pass, OR 97527

RFP Construction Manager - Reedsport Community Charter School Seismic Retrofit
Renovation
Post-Bid
$1,782,300 CJ est. value
Reedsport, OR 97467

Last Updated 02/15/2024 12:31 AM
Project Title

Oregon Zoo Cascade Bldg Single User Restroom Add-on/Breakroom Remodel

Physical Address View project details and contacts
City, State (County) Portland, OR 97221   (Multnomah County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $189,876 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction remodel/addition for the Oregon Zoo Cascade Building. Please download the ITB for further information. 1. Expand existing Cascade breakroom by removing approximately 18-feet of wall on North side of breakroom as depicted on drawings attached. Install header to span opening as specified. 2. Build wall between existing breakroom and proposed single user restroom. (East wall). Build hard-lid ceiling over restroom with exhaust fan and specified lighting. (Leave access from break room side). Add needed plumbing in newly built wall for kitchen sink in breakroom and plumbing for restroom as specified. Electrical outlets for counter tops as well as one GFI for restroom near sink. Insulate ceiling and new wall. 3. Install new lockers as specified in breakroom as pictured. Five (5) new tables and 20 new chairs will be added (CPCI). New refrigerators (OPOI) (brand and size TBD). Kitchen countertop with sink and hot and cold-water dispenser(specified), upper and lower Laminate cabinets of break room as shown. Dish washer to be installed in lower cabs, (Brand TBD) (CPCI). 2 microwaves (OPOI), Install garbage disposal in sink. 4. Exterior door to be installed on east wall of single-user restroom with ADA-push button opener and indicator lock as specified for single-user restrooms. 5. Single user restroom will consist of one (1) adult changing table, one (1) electric hand dryer, one (1) double flush toilet, and one (1) wall hung sink with hands-free faucet and mirror. Floor will be MMA flake as used in other newly remodeled restrooms. Walls will have white 24"x12" stacked tile with grey-epoxy grout to match cascade main-user restrooms. Paint will be "Brilliant White," Benny Moore, Aura, to match existing restrooms. 6. Paint breakroom walls and ceiling same as single user (as specified). 7. Change existing breakroom lighting, to LED hanging fixtures (as specified). 8. In-fill existing door opening and finish. 9. Add proper amount of electrical and plumbing needed for project (as specified). 10. Other details in specifications and drawings that may not be list in this scope. Requests for additional information or interpretation of the contract documents shall be delivered to bidsandproposals@oregonmetro.gov Question Deadline 09/03/2023

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents