Similar Projects
Compound and Fire Cold Water Meters
Infrastructure
Bidding
Virginia Beach, VA

Repair, Replace and Install Water and Sanitary Sewer Lines
Infrastructure
Bidding
Chesapeake, VA

Red Wing Lake Golf Course City Water and Sewer Services
Post-Bid
Virginia Beach, VA 23456

Lake Gaston 60-Inch Raw Water Pipeline Meherrin River Crossing Replacement
Post-Bid
Virginia Beach, VA 23456

Replace Potable Water Line
Results
Norfolk, VA

Scottsville Water Treatment Plant - Finished Water Metering Improvements
Results
$115,500 est. value
Scottsville, VA 24590

Distribution System Water Meter Upgrade
Infrastructure
Bidding
Cape Charles, VA

Annual Water and Wastewater Construction, Repair and Related Services
Term Contract
Post-Bid
$400,000 to $2,000,000 est. value
VA

Leesburg Pike and South Van Dorn Street Water Main Replacements
Results
Fairfax, VA 22031

Cliff Mountain Water Project (Phase 1- Blackgum Lane)
Infrastructure
Bidding
Gate City, VA

Libbie Mill Offsite Water Line Plans
New Construction
Post-Bid
Richmond, VA

Furnish and Deliver Fire Hydrants
Term Contract
Results
$238,651 est. value
Fairfax, VA 22031

Fire Hydrants, Hydrant Extension and Collision Kits
Infrastructure
Bidding
Norfolk, VA

Rickey Road Waterline Extension Project
Post-Bid
Wytheville, VA 24832

Installation of New Water Facilities
Results
$5,000,000 to $8,000,000 est. value
Richmond, VA 23219

Last Updated 06/25/2021 03:53 PM
Project Title

Water Meter Testing, Calibration, Repair & Replacement Service

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22801   (Harrisonburg City County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City has meters in place ranging in size from five-eighths (5/8) inches to twelve (12) inches. Meters 2 inches and greater to be tested on a rotating schedule, with approximately 150 meters to be tested annually; 99% (ninety-nine percent) of them are field test ready – with accessible test outlets, bypasses, and operational valves which allow them to be completely isolated. With the COVID-19 pandemic impacting the City’s testing schedule last year, it is anticipated that the City will test approximately 225 meters in the next year.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Metering, Disinfecting of Water Utility Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents