Reported | 05/26/2022 12:00 AM |
Project Title | Fire Station No.16 (Lathan) - Emergency Generator |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36605 (Mobile County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of a fire / police facility in Mobile, Alabama. Completed plans call for the renovation of a fire / police facility. The City is accepting quotes for furnishing all labor, materials, insurance, tools, equipment and supplies, and all associated travel time and expenses required to provide and install a new 60kW 208Y/120V Diesel Generator, attached 580 gallon diesel double-hulled tank, and a 400A Automatic Transfer Switch at Fire Station No.16, located at 1951 Maryvale Street, Mobile, Alabama 36605, in strict accordance with the Contract Documents. For questions regarding this project, please contact the City of Mobile Project Manager, Mark Thomas at the Architectural Engineering Department, (251) 208-2848 or thomasm@cityofmobile.org.Disadvantaged Business Enterprise participation may be required. A Directory of DBE Vendors can be found electronically.Contact the Project Manager, Mark Thomas, at the City of Mobile, Architectural Engineering Department, (251) 208-2848 phone or e-mail thomasm@cityofmobile.org for further clarification regarding this Request for Quotes. A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against the Contractor for the entire period that any part of the Work remains uncompleted or required closeout documents are not acceptably submitted for more than thirty (30) calendar days after the time specified for the Substantial Completion of the Work, the amount of which shall be deducted by the Owner, and shall be retained by the Owner out of monies otherwise due the Contractor in the final payment, not as a penalty, but as liquidated damages sustained. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |