Similar Projects
Construction Of Unimproved Alleys
New Construction, Infrastructure
Bidding
$600,000 est. value
Cape Coral, FL 33909

Holiday Hills Drainage Improvement Project
Infrastructure
Bidding
$1,374,023 est. value
Jasmine Estates, FL 34668

Bay Drive Stormwater Improvements
Post-Bid
Pompano Beach, FL 33060

CVS #7980 - ADA Parking
Renovation
Post-Bid
Macclenny, FL 32063

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Site Maintenance
Results
Newberry, FL 32669

FPL Okeechobee Transmission Corridor
New Construction
Construction
$1,685,000 est. value
West Palm Beach, FL 33409

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

SR 10 (US 90) Milling and Resurfacing
Infrastructure
Bidding
$2,154,736 est. value
FL

Safe Harbor Marina @ North Palm Beach
Renovation
Post-Bid
North Palm Beach, FL 33408

2717 Van Buren Street Redevelopment Opportunity
Results
Hollywood, FL 33020

4Roots Farm Campus - Sitework
New Construction
Construction
Orlando, FL 32813

Construction Services for Offsite Improvements
Alteration
Bidding
$300,000 est. value
Bartow, FL

Taylor Creek Southeast 8th Avenue Stormwater Conveyance
Post-Bid
Okeechobee, FL 34974

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Results
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Last Updated 05/24/2022 09:30 AM
Project Title

Lake Lorraine Phase II Project

Physical Address View project details and contacts
City, State (County) Lake Lorraine, FL 32579   (Okaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of clearing and grubbing, demolition, grading and excavation, installation of pond, installation of stormwater piping and structures, concrete cart path installation, pavement patching, maintenance of traffic, sodding, and other work as shown on the construction drawings and described in the specifications to construct stormwater improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings, Turf and Grasses, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents