Similar Projects
Last Updated | 08/31/2022 07:03 PM |
Project Title | Syracuse City Corporation Secondary Reservoir Project Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Syracuse, UT 84075 (Davis County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,000,000 [brand] Estimate |
Plans Available from | Civil Engineer - 08/12/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of the prequalification process is to select those general contractors the Owner deems to be qualified and capable of completing the project on schedule in conformance with the Contract Documents. Only those firms that are prequalified by the Owner will be allowed to submit a Bid on the Project. Please review the prequalification form for a full tentative project schedule. Pre-Qualification:Yes The Secondary Reservoir Project Phase 2 consists of: Excavation, dewatering, and site grading for a 37 ac-ft reservoir and pump station Installation of concrete liner for reservoir Installation of perforated PVC pipe for underdrain of reservoir and pump station Connection to existing utilities including 24" HDPE pipe, concrete manholes, etc. Installation of approximately 500 feet of 30" HDPE Pipe and associated valves and fittings Installation of approximately 2,000 feet of 36" HDPE Pipe and associated valves and fittings Installation of approximately 1,500 feet of 24" HDPE Pipe and associated valves and fittings Installation of concrete pad and concrete vault for vertical turbine pumps Installation of 4 - 150 HP 2,000 gpm pumps (with additional future ports for a total of 14,000 gpm), filters, and associated piping and appurtenances Installation of 250 feet of 30' wide asphalt road with curb and gutter Installation of 30'-8" x 12'-0" electrical building Installation of variable frequency drives, electrical cabinets, HVAC units, and associated appurtenances for pump station Installation of boundary chain link fence and automatic access gate. The Prequalification Form may be examined or obtained at the following locations: An electronic set of the prequalification packet can be emailed upon request by contacting J-U-B Engineers at anielson@jub.com for no charge. . The Owner reserves the right to waive any informality or seek additional information from potential applicants. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |