Reported | 04/20/2021 12:00 AM |
Project Title | East Fire Detection Replacement |
Physical Address | View project details and contacts |
City, State (County) | Denver, CO 80237 (Denver County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PP201087 East HS Fire Detection Replacement: a) New Fire Alarm Control Panel, annunciator and Remote Status Panel (LCD) b) Remove all existing FA cabling. Existing cabling may use where approved by DPS c) Remove all Conduits/Wiremold/Panduit/Boxes associated with the Fire Detection RFP that does not meeting the current DPS Design and Construction Standards. d) Install new cabling and wiremold throughout the building in accordance with DPS Design and Construction Standards, (new cabling color shall be determined by the DPS QA/QC department). All wiremold to be installed below existing ceilings. e) All new installation cabling work shall be in conduit or wiremolding where approved by DPS f) Initiation Devices (smoke, heat, CO and manual pull stations as needed) g) Remote lights as needed h) Notification Devices (Voice and Strobes) i) LED Dictionary (s) and Map(s),LED Point-lit Graphic Annunciator or Computer Graphic Annunciator. Indicate on bid type of annunciator being proposed. Computer Graphic Annunciator preferred for main school building. Out buildings to have LED Directory with graphic map.Main school building to monitor and annunciate the out buildings. j) Guards k) Elevator(s): Connections and Upgrade. Elevator shunt trip l) Kitchen Hood System(s): Connections m) Mechanical: i) All HVAC Systems must shutdown on General Alarm (including but is not limited to the Building Automation Systems. n) Fire/ Smoke Damper Controls (all existing fire and smoke dampers must properly engage). o) Building Automation Systems: Contractor to Subcontract all Building Automation System Connections and equipment shutdowns with DPS Controls Vendor. p) Fire Sprinkler System: i) Flow(s)/ Tamper(s) Switch ii) Connections iii) If Flow(s)/ Tamper(s) are not monitored or functioning correctly, Contractor shall subcontract a Fire Suppression contractor to install/ replace components under this RFP. q) Auditorium/ Gym and other locations as needed : Lighting/ Sound Control Connection r) AES Subscriber Installation/ Connection s) Replace and Upgrade: i) For Ceiling Tiles: The entire ceiling tile(s) affected by the removal. t) New Graphic Maps and Annunciators. DPS to provide new room numbers after project award u) Updating all Electrical Panel Labels v) Patch and Painting: Where Conduits/Wiremold/Panduit/Boxes have been removed, Contractor shall patch and paint (matching existing): w) For Drywall/ Plaster: 6” width to the left and right of the removal location times the length. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |