Similar Projects
Funkhouser Building Improvements
Renovation
Conception
$110,000,000 est. value
Lexington, KY 40508

Construct Research Building - University of Kentucky
New Construction
Conception
$265,000,000 est. value
Lexington, KY

College of Design
Renovation - 1,445,000 SF
Design
$38,600,000 est. value
Lexington, KY 40508

New College of Medicine
New Construction - 380,000 SF
Design
$380,000,000 est. value
Lexington, KY 40506

Nursing Steam Vault Renovation
Renovation
Bidding
$600,000 est. value
Lexington, KY 40508

Vaughn Warehouse - Hi-Speed Roll Up Doors
Post-Bid
Lexington, KY 40504

LTS Buildings 100, 200, and 300 Window Replacement
Post-Bid
Lexington, KY

CEB 151 Elevated Control Room
Renovation
Results
$40,000 to $50,000 est. value
Lexington, KY 40503

Newtown Science Building Classroom Fit Up
Build-Out - 4,000 SF
Results
$472,548 est. value
Lexington, KY

Renovate/Improve Nursing Units University of Kentucky Hospital - University of Kentucky
Renovation
Conception
$7,000,000 est. value
Lexington, KY 40506

Window Assessment with Replace/Repair and Building Wash and Seal
Alteration
Post-Bid
Lexington, KY 40508

Research Building #2 Phase 4 Design Release 1 - Fit-Out
New Construction, Build-Out - 40,400 SF
Results
$15,517,519 est. value
Lexington, KY

Improve University of Kentucky Hospital Facilities University Kentucky Chandler Hospital - University of Kentucky
Renovation
Conception
Lexington, KY 40506

Window Replacement - Peterson Service Building
Alteration
Post-Bid
Less than $700,000 est. value
Lexington, KY 40508

CM Services for Delta Gamma Housing - 2555.0
Renovation, Addition
Results
$6,000,000 est. value
Lexington, KY 40508

Last Updated 07/22/2022 09:08 AM
Project Title

TC-223: Door and Door Hardware Systems UK Project # 2402.16

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 22, 2022, this project has not yet been awarded. A timeline for award has not yet been established. This Requests for Proposals (RFP) is issued to solicit proposals from qualified, experienced, financially sound, and responsible firms to provide labor, equipment and materials for complete Trade Contract 223 - Furnish Doors & Hardware systems for the University of Kentucky. Questions Due: 05-04-22

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents