Similar Projects
HVAC Renovation
Alteration
Bidding
$513,000 est. value
Charlotte, NC 28262

County Courthouse - HVAC Replacement Project
Alteration
Bidding
NC

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

80 Ton Chiller
Post-Bid
Charlotte, NC

Charlotte-Mecklenburg Government Center HVAC Replacement
Results
$20,400,000 est. value
Charlotte, NC 28202

Lee S. Dukes WTP HVAC Replacement
Results
Charlotte, NC

UNCC HVAC, Plumbing and Electrical Repairs - McEnir
Alteration
Post-Bid
Charlotte, NC

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Results
$773,508 est. value
Cornelius, NC 28031

Replace 7 Rtu`S At J.V. Washam Elementary School
Alteration
Post-Bid
Cornelius, NC 28031

E-Concourse Air Handling Unit #64 Replacement
Results
Charlotte, NC

Replacement of 13 Unit Ventilators
Alteration
Post-Bid
Charlotte, NC 28277

Needlepoint Bipolar Ionization
Results
Charlotte, NC

Condenser Water Loop - Concourse E
Alteration
Post-Bid
$200,000 est. value
Charlotte, NC 28208

Air Handling Unit Replacement - Alexander Graham Middle School
Results
Charlotte, NC

Replace Exhaust Fans at 6 Schools
Alteration
Post-Bid
Charlotte, NC 28205

Last Updated 04/13/2022 12:49 PM
Project Title

Replace 13 Unit Ventilators, 2 Split Systems, and Existing Pneumatic Control Systems With Full Direct Digital Controls at South Charlotte Middle School

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28277   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Goals Details See Document Page No: 22. Provide a quote for replacing the existing pneumatic controls and system with Direct Digital Controls and all new end of line devices. a. Furnish a complete, tested, fully integrated and completely operational Building Automation System including all necessary software and hardware, wiring, graphics, and control equipment in compliance with this Specification and the Construction Documents. b. Include the complete campus showing all buildings on the front-end GUI for the site. If necessary, include new controls for any missing structures to be consistent with the main building. c. Supply a new Graphical Front Page, which includes previous “D-Wing” phase and new “Cafeteria” phase. Also provide new Boiler, Chiller, and Dual Temp Graphics. 2. A complete project should be handed over to CMS as turnkey. The Contractor shall furnish and install a complete building automation system including all necessary hardware and “open-licensed software” required to perform the control sequences and all application, programming, uploading/downloading program files, graphical editing, and diagnostic functions including trends and alarming.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents