Similar Projects
Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

Crack Filling of Roads (2022)
Infrastructure
Bidding
$140,000 est. value
Waukesha, WI

Asphaltic Seal Coating of Roads With Black Boiler Slag (2022)
Infrastructure
Bidding
$80,000 est. value
Waukesha, WI

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

2021 Road Program
Post-Bid
Brookfield, WI 53045

Lawndale Avenue, Fairmont Avenue and Caldwell Street Utility and Street Improvements
Renovation
Results
Waukesha, WI 53188

Lawndale Avenue, Fairmont Avenue and Caldwell Street Utility and Street Improvements
Renovation
Results
Waukesha, WI 53188

Flex Patching of Roads (2022)
Infrastructure
Bidding
$200,000 est. value
Waukesha, WI

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Business Park East Street and Intersection Improvements
Infrastructure
Bidding
$480,000 est. value
Sussex, WI 53089

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Calhoun Road - National Avenue to Beloit Road Reconstruction
Results
$1,921,284 est. value
Waukesha, WI 53186

2021 Road and Parking Lot Crack Fill and Striping
Infrastructure
Post-Bid
WI

2021 Thackeray Trail Reconstruction
Results
Oconomowoc, WI 53066

Last Updated 06/10/2022 05:58 AM
Project Title

Custer Lane Reconstruction

Physical Address View project details and contacts
City, State (County) Lannon, WI 53046   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 1. Reconstruction and expansion of 1,300 linear feet (LF) of Custer Lane, including 1,200 LF of bike path, 855 LF of sanitary sewer, and 568 LF of water main. 2. Addition of a left-turn lane, including 1,400 LF of shoulder work on West Main Street and County Trunk Highway (CTH) F.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents