Similar Projects
James Avenue Lift Station Rehab Project
Infrastructure
Bidding
$600,000 CJ est. value
Saint Paul, MN 55105

Battle Creek Road Reclamation Project
Infrastructure
Bidding
$720,000 CJ est. value
Saint Paul, MN 55119

Mechanical Island Unloading
Term Contract
Sub-Bidding
$25,000,000 CJ est. value
Saint Paul, MN 55101

Metal Fabrication Program
Term Contract
Sub-Bidding
Saint Paul, MN 55101

Facility Security Systems, Equipment, and Software with Related Services
Term Contract
Post-Bid

Tree Maintenance Equipment, Attachments, and Accessories
Term Contract
Post-Bid

Furnish and Install In-Floor Brake Testers at MSP
Term Contract
Results

Grand Rapids Area Portable Restrooms
Term Contract
Results
Grand Rapids, MN

Sun Ray Gate G Construction
Infrastructure
Bidding
$180,000 CJ est. value
Saint Paul, MN 55101

Repair Parts, Access, Brooms, Labor Elgin Sweepers
Term Contract
Post-Bid
$50,000 to $75,000 est. value

Power Wash Exterior Masonry
Alteration
Results
$494,000 est. value
Saint Paul, MN 55102

Furnish And Delivery Of Snow Fencing Materials
Term Contract
Post-Bid

Bmp Retrofits - 2022 School and Faith - Based Sites
Infrastructure
Results
$477,625 CJ est. value
Saint Paul, MN 55101

Pest Management Services with Related Products
Post-Bid

Robin Lane Traffic Calming
Infrastructure
Results
$217,177 CJ est. value
New Brighton, MN 55112

Last Updated 07/26/2022 03:42 PM
Project Title

FY23 Region 3 Tree Protection Projects

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55101   (Ramsey County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Natural Resources is seeking bids for: The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary for the bud capping of conifer and oak buds on State lands on 40 sites totaling approximately 1056 acres. Failure to respond to latest event version may result in bid rejection. Please be aware that there are attachments to this event. The vendor is responsible for reviewing all attachments and complying with all requirements to this Event. DNR will be the determining factor if vendor meets specifications. All questions should be directed to the buyer listed in this event. Unit price must include all costs such as labor, materials, tools, transportation, equipment, sales tax, use tax and all else necessary for completion of the project. Direct Pay Permit 1114 does not apply to this project. Award--Item, Group, Total: Responses that do not comply with the solicitation will be considered nonresponsive and will be rejected. The award will be made to the lowest responsible vendor meeting the specifications and all terms and conditions. The State reserves the right to award items separately, by grouping items, or by total, whichever is deemed most advantageous to the State. The responder may quote "all or none," but unit prices for each item must be shown. The responder must specify if quoting "all or none."

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents