Similar Projects
Medicine Bow Roads Phase 2 Project
Infrastructure
Bidding
Medicine Bow, WY

2022 Asphalt and Concrete Repair Projects
Infrastructure
Bidding
$300,000 est. value
Cheyenne, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Cheyenne Streets - Warren Ave (Lincolnway - 24th)
Infrastructure
Results
Cheyenne, WY

District 1 Crack Seal
Infrastructure
Results

District 1 Contract Patching
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY 82009

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Grading, Placing Crushed Base and Bituminous Pavement Surfacing, Removal and Replacement Of Structure, Sidewalk (Conc), Guardrail and Miscellaneous
Infrastructure
Results
Cheyenne, WY 82008

Pine Bluffs High School and Burns Schools Concrete Projects
Infrastructure
Bidding
$250,000 est. value
Pine Bluffs, WY 82082

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Grading, Milling Plant Mix, Placing Crushed Base and Bituminous Pavement Surfacing (Recycle), Chip Seal and Miscellaneous
Infrastructure
Results
WY

Nationway Overlay Phase 1
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY

Entrance Road and Parking Area Improvement Project
Infrastructure
Post-Bid
Saratoga, WY 82331

Grading, Milling Plant Mix, Bituminous Pavement Surfacing (recycle), Chip Seal (overshoot), Bridge Rehabilitation and Miscellaneous Work
New Construction, Infrastructure
Results
WY

Last Updated 04/27/2022 04:51 AM
Project Title

Chip Sealing

Physical Address View project details and contacts
City, State (County) (Albany, Carbon, Laramie Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous Surfacing, Chip Seal, Traffic Control And Miscellaneous Work At Various Locations In Transportation District 1. 1 109.04000 Force Account Work 500.000 $$ 2 109.08000 Mobilization 1.000 Ls 3 215.01000 Contractor Storm Water Control 1.000 Ls 4 409.03075 Chip Seal (Overshoot) 790,000.000 Sy 5 409.03085 Emulsified Asphalt Modified 1,310.000 Ton 6 409.03090 Emulsified Asphalt Overshoot 270.000 Ton 7 703.03100 Flagging 1,500.000 Hr 8 703.03110 Temporary Traffic Control 1.000 Ls 9 703.03200 Sequential Chevron 1.000 Ls 10 703.03205 Portable Variable Message Sign 1.000 Ls

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents