Similar Projects
Ward Boulevard Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, NC 27893

Train Station Canopy Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Wilson, NC 27893

Demolition Services - 526 Stemmery St.
Demolition, Infrastructure
Bidding
$200,000 CJ est. value
Wilson, NC 27893

Isolated Temporary Seating Shoring at Fleming Stadium
Renovation
Post-Bid
$40,000 est. value
Wilson, NC 27893

Natural Gas System Improvements
Infrastructure
Post-Bid
$315,000 CJ est. value
Wilson, NC 27893

Revisions to Office Addition for Building 500
Addition, Demolition, Renovation, Infrastructure
Results
$450,000 CJ est. value
Wilson, NC 27893

Grading, Drainage and Paving on Raleigh Road Parkway
Infrastructure
Results
$2,093,089 CJ est. value
Wilson, NC 27896

ABEC Manufacturing Facility
New Construction, Infrastructure - 50,000 SF
Pending Verification
$11,000,000 CJ est. value
Wilson, NC 27893

Heatherton Grove
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Wilson, NC 27896

Pipe Culvert Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Wilson, NC 27893

Underground Primary Replacement
Infrastructure, Alteration
Post-Bid
$700,000 est. value
Wilson, NC

Wilson Visitor Center
Addition, Demolition, Renovation, Infrastructure - 3,300 SF
Results
$764,700 CJ est. value
Wilson, NC 27893

Harvest Family Health Center Addition
Addition, Demolition, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Elm City, NC 27822

Circle K #2720939 / Wilson
New Construction, Infrastructure - 5,200 SF
Post-Bid
$2,000,000 CJ est. value
Wilson, NC 27893

Lower Bloomery Swamp Sewer Improvements
Infrastructure
Results
$300,000 CJ est. value
Wilson, NC 27893

Last Updated 04/28/2023 05:08 PM
Project Title

Gillette Tennis / Pickle Ball Facility

Physical Address View project details and contacts
City, State (County) Elm City, NC 27822   (Wilson County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The City of Wilson is accepting bids for construction of a Tennis/Pickleball Facility at Gillette Athletic Complex in Wilson, NC. Building No. 1: 24,750 sf open wall pre-engineered steel structure to be used for covered pickle ball courts. Including, but not limited to, concrete footing and slab, sub-grade soil treatment, masonry, electrical, mechanical, court fencing, and inground sleeves for net post. Building 2: 2,737 sf enclosed, conventionally constructed building to be used for concessions, offices, storage, and toilets. Including, but not limited to, concrete footings and slab, sub-grade soil treatment, load bearing masonry, interior framing, interior finish, wood truss, plumbing, electrical, and mechanical. Building 3: 2,737 sf open wall conventionally constructed shelter. Including, but not limited to, concrete footing and slab, sub-grade soil treatment, steel framing, wood truss, and electrical. Entrance Road and Parking Lot (asphalt with 24" curb and gutter). Two (2) 3-Court Pickleball Facilities including concrete court base, nets, poles and fencing. Two (2) 6-Court Tennis Court Facilities including asphalt court, base, nets, poles and fencing. Concrete Plaza and 0.5 Mile Asphalt Walking Track. One (1) Croquet Court, Three (3) Bocce Ball Courts and Three (3) Horseshoe Pits. Site grading includes storm drainage piping, structures, and erosion control measures. Water and sewer services including a prefabricated duplex grinder pump station. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered Question Deadline 03/27/2023

Details

24,750 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents